My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering 4/24/2018 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
HDR Engineering 4/24/2018 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 10:33:39 AM
Creation date
4/26/2018 10:33:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering
Approval Date
4/24/2018
Council Approval Date
4/11/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Matt Welborn
Subject / Project Title
2017 Utility Connection Charge Study
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$13,200.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
data inputs and outputs, and the steps necessary to update and operate the model for future use. <br /> The training will be provided by Kevin Lorentzen of HDR. The training sessions will be conducted <br /> at the City's offices. Additional hours are included within this amendment for future as-needed <br /> telephone support/assistance beyond the formal training sessions envisioned within this <br /> amendment. <br /> Deliverables from Task 3— <br /> • Model training in the use of the model. <br /> • Telephone support/assistance with the model after the training sessions (provided through <br /> the agreed upon contract period) <br /> Task 4: Project Administration / Project Management <br /> With the extension of time for this project, along with this amendment, additional project <br /> administration will be incurred by HDR. This task reflects the additional project administration and <br /> project management costs incurred by HDR as a result of this amendment. These hours are <br /> primarily related to monthly project invoicing and project management. <br /> Deliverables from Task 4— <br /> • Provide additional project administration/management associated with this amendment. <br /> This concludes the amended scope of services. Any additional work outside of this amended scope <br /> of work will be provided on a time and materials basis. <br /> Project Time Schedule <br /> With this amendment and the services to be provided, HDR is requesting that the current <br /> agreement between the City and HDR to conduct the connection fee study be amended to have a <br /> completion date of no later than December 31, 2018. <br /> Page A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.