My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BASE FILE 2018-04-27
>
Address Records
>
W CASINO RD
>
3003
>
BASE FILE
>
3003 W CASINO RD BASE FILE 2018-04-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 7:58:00 AM
Creation date
4/27/2018 7:57:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 2. Staging areas fqr vehicle maintenance activities during construction must be specified. These <br /> areas must be wel) away from all drainage caurses. (SEPA Water, Pfant and Animal and Land and <br /> Shoreline Use Polic'res) <br /> 3. All starm drains must be stenciled with language similar to the fiollowing: "Dump No Waste, <br /> Drains to (Stream/Wetland/Groundwater)." This reminder is typically spray-painted on fio the <br /> ground adjacent to the catch basin with the use of a stencil. The treatment needs to be repeated, <br /> approximately annually, when the paint wears off, The developerJowner may either perform the <br /> stenciling, or give permission for volunteer groups to enter onto fihe property and perform the <br /> stenciling. (SEPA Water, Plant and Animal, and Land and Shoreline Use Policies) <br /> 4. During construction activities, all spills must be contained and removed in such manner as to <br /> prevent their entering the waters and soils of the stafie. Cleanup of spills shall take precedence over <br /> other work on-site. (SEPA Water, Plant and Animal, and Land and Shorefine Use Policies) <br /> S: Construction equipment and vehicles must be maintained so they do not Ieak fuels or lubrican#s. <br /> During construction, a staging area must be specified for all vehicle maintenance activities. The <br /> staging area must be tocated well away from al( drainage courses. Where possible, a!( stormwater <br /> from related maintenance areas must be directed to the sanitary sewer, rather than the stormwater <br /> system. {SEPA Earth,Water and Environmentai Health Policies) <br /> 6. During construction activities, all spills of fuel and hazardous materiafs must be contained and <br /> removed in such a manner as to prevent their entering the waters and soils of the State. Cleanup of <br /> spills must take precedence aver other work on site. (SEPA Earth, Water and Environmental Health <br /> Policies) <br /> 7. During construction, all petroleum products, chemicals, and building materials that could <br /> contaminate runoff must be stored in a lined covered area. An impervious berm must be <br /> constructed around the perimeter of the storage area. The storage acea must be located away from <br /> environmentally sensitive areas. (SEPA Earth,Water and Environmental Health Policiesj <br /> � 8. On sites containing hazardous materials, procedures to use in case of spills must be posted. <br /> (SEPA Earth,Water and Environmental Health Policies) <br /> SEPAlb- 3 <br /> ��� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.