My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BASE FILE 2018-04-27
>
Address Records
>
W CASINO RD
>
3003
>
BASE FILE
>
3003 W CASINO RD BASE FILE 2018-04-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 7:58:00 AM
Creation date
4/27/2018 7:57:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> 4. Stormwater from this project shall be managed in accordance with applicable City of Everett <br /> Stormwater Management Standards. <br /> 5. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> 6. City streets and alleys are to be!<ept clear of dirt and debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 7. Lack of comment on the plans submitted with the application does not constitute approval <br /> af these plans. <br /> 8. As-builts of storm sewer,sanitary sewer, and water systems will be required to be � <br /> submitted per City Design and Construction Standards and Specifications for Developrnent. <br /> 9. 1#c4ntaminated soil/eoncrete found it must be disposed at an approved site. <br /> 10.The construction plans must be designed from a site survey performed by a licensed State <br /> of Washington land surveyor. <br /> 11.All work performed by the geotechnical engineer or testing lab shall be reparted directly to <br /> the City Public Vllorks Inspectar before cavering work can be continued by the contractor. <br /> Daify reports shall be kept by the soils investigatar/tester and submitted to the Public <br /> Works Inspector within 24 hours. <br /> 12.All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems,the ground must be <br /> covered with mulch as directed by the City Engineer. <br /> 13. Temporary erosion control measures for construction activify must be operational prior to <br /> commencement of any clearing or earthwork. <br /> Fire Department—Jim Venturo—425.257.8124-No comments received. <br /> APPLICABLE CONDITIf)NS FROM SW EVERETT MITI�ATION DECISION DOCUMENT: <br /> 1. Developments with hazardous materials on-site, including fuel tanks, must comply with all <br /> applicable local, state and federal requirements. AI( developments using toxic or hazardous <br /> materials must incorporate facilities and procedures for the safe handling and effective monitoring <br /> of toxic or hazardous materials, which include spill entrapment, training, and special handling, thus <br /> reducing the potential for release of hazardous or toxie materials to the groundwater system. (See <br /> Section 3.6 of the EIS) (SEPA Water, Plant and Animal, and Land and Shoreline Use Policies) <br /> SEPA16� <br /> ,;.�,.... <br /> � <br /> 3/ <br /> J �. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.