Laserfiche WebLink
M581-02 _3'-0"_ LEGEND <br /> ® PIPE MAIN ANCHOR <br /> �\ PIPE GUIDE <br /> / C1 ANCHOR 1-1/2 PC EXPANSION JOINT <br /> 1 PS-# PIPE SUPPORT/ANCHOR <br /> i �\ �\ <br /> / PS-7 -� � SEEM ! I 1 <br /> / M581-04 M581-05 <br /> _ SEE TYPICAL a <br /> I TRAP DETAI 2 cot t <br /> M581-06 <br /> STAIRS� <br /> GENERAL NOTES <br /> M581--02 1. STRUCTURAL EMBEDS IN TUNNELS OCCUR EVERY <br /> / 8'-0". SEE 2/S577-01 FOR EMBED DETAILS. <br /> / D <br /> M58`1�-02 M581-02 2. UNLESS OTHERWISE NOTED, FOR 14" HPS, USE <br /> / 4-1/2" FIBERGLASS INSULATION IN TUNNEL SECTIONS <br /> AND VAULTS. INSTALL METAL COVER AT VAULT <br /> 6 LOCATIONS. SE <br /> PS-1 E DRAWING M2B. <br /> / (SIMILAR) 1 1j2 CA 3. STEAM OPERATING PRESSURE IS 200 PSIG. BOILER <br /> 2" FORCE MAIN ' RELIEF PRESSURE IS 255 PSIG. <br /> 4. THE STEAM PIPING AND CONDENSATE PIPING <br /> / J LAYOUTS ON THIS PROJECT WERE DESIGNED <br /> I / TO ACCOMMODATE A FUTURE FIRE WATER MAIN <br /> / AND FUTURE AIR AND DOMESTIC PIPE AS <br /> 1 WELL. THE FUTURE FIRE WATER MAIN SHOULD <br /> E. OCCUPY THE LOWEST LEVEL OF THE PIPE <br /> / CHASE WITH A BOTTOM OF PIPE NOT TO <br /> 42" STORM EXCEED 6" ABOVE FINISHED FLOOR ELEVATION <br /> DRAIN SEE FOR OPTIMUM SPACE UTILIZATION. <br /> 1 1/2" CA CIVIL <br /> z" FORGE MAIN REFERENCE DRAWINGS <br /> • <br /> 1"PC & 2"FLASH � t 1/2"CA <br /> TANK VENT PS-I CONSTRUCTION NOTES <br /> ALONG THIS SIDE 2" FORCE MAIN 1. SEE CIVIL DRAWINGS FOR TUNNEL AND VAULT <br /> OF TUNNELS� <br /> PLAN <br /> LOCATIONS & ELEVATIONS. <br /> VAULT S9 ENLARGED PIPING PLAN �® 2. STEAM PIPING SLOPE TO FOLLOW TUNNEL <br /> SCALE: 3/8"=1'-0" M456-02 N SLOPE. SEE CIVIL DRAWINGS FOR SLOPE. <br /> 3. SUPPORT 2", 1 1/2" & 1-NPS PIPE (FLASH <br /> I I VENT, HPC, PC, CA) A MAXIMUM 8'-0" O.C. IN <br /> TUNNELS. REFER TO TUNNEL SECTIONS <br /> M581-03, SEE M581-05 FOR SMALL BORE <br /> PIPE SUPPORTS TO USE. <br /> I3/4"z1" C I <br /> RED I M5 2 4. CONDENSATE PIPING SHALL BE INSTALLED WITH <br /> 8 -0 <br /> SEE TYPICAL 3/4'HPC A MINIMUM 1" FIBERGLASS INSULATION FOR <br /> i <br /> TRAP DETAI 2 PERSONNEL PROTECTION UNLESS OTHERWISE <br /> M581--06 NOTED. SEE DRAWING M26. <br /> 14"HPC <br /> —— 5. PIPE SUPPORT STATION NUMBERS DO NOT <br /> ALLOW FOR GAP TOLERANCE IN TUNNEL <br /> SECTIONS. INSTALL SUPPORTS IN MIDDLE OF <br /> THE CLOSEST TUNNEL EMBED. <br /> 7 <br /> - ©PROVIDE 6"THICK "FOAMGLASS" INSULATION IN THIS <br /> Pp SECTION OF PIPE. <br /> 2"FORCE <br /> MAIN I PROVIDE EXTRA STRONG (XS) 14"TEE. <br /> Ifv�wau ®PROVIDE 3/4" SOCKET WELD ENDS ON ALL FITTINGS <br /> I ON CONDENSATE PIPING TO THE END OF THE LIFTED <br /> SECTION TYPICAL. <br /> VENT� O -END OF RUN <br /> ACCESS FOR 1-1/2"CA <br /> LADDER- C PROVIDE CAP <br /> M581-02 8' 4' 0 4' 8' 16' <br /> j 6?%dw6=wm6iiiiii@ <br /> 100% SUBMITTAL - 05.02.13 ACOFFMAN <br /> VAULT S10 ENLARGED PIPING PLAN <br /> 2 "DI .WA�,D, <br /> SCALE: 3/8"=1'-O" M4� NOT FOR CONSTRUCTION <br /> sm REff" W APPROVED DATE svN REVNDN By APPROVED DATE wBTRE CURRENT REVISION SYNBpL DATE <br /> ORIG SIZE-45-001 CONNECTION-SWAM UPGRN7ES 11578401 CEI/MS MS 05.02.13 G`Z'aF wesOT ACCEPTABILITY R.LEIMER 05.02.13 11578401 <br /> ` s_`.<` ' THIS <br /> AND/OR R.LEn"ER os.o2.t3 STEAM UPGRADES ENLARGED PLANSAPPROORI os.ozl3 <br /> BOE, "® APPROEDe <br /> DEPT. DAM CEI 05.02.13 0E SITE - 45-001 CONNECTION - STEAM UPGRADES M456-03 <br /> f� CH <br /> M.SOTURA 05.02.13 <br /> •- SITE 45-YD OB N0 CO P NO <br /> 11578401 � r} <br /> MECHANICAL MASTER EVERETT, WAD NO' 45-YD-M456-03 V/ <br />