Laserfiche WebLink
Pag 1 of 4 <br /> Tim Tyler <br /> From: Fieldcamp, Dirk H [dirk.h.fieldcamp@boeing.coml <br /> Sent: Thursday, August 04, 2005 8:11 AM <br /> To: Tim Tyler <br /> Subject: FW: Corrected FutureFactory Executive Summary <br /> Tim, <br /> Her is the Executive Summary you requested from Greg. Please let me know if you need anything else or have <br /> questions. <br /> Thanks, <br /> Dirk H. Fieldeanip Jr. <br /> Dirk H. Fieldcamp Jr. <br /> Civic Affairs Manager <br /> Everett District Facilities Services <br /> (425)342-5343 <br /> (425)342-8167 Fax <br /> From: grkeith@mac.com [mailto:grkeith@mac.com] <br /> Sent: Wednesday, August 03, 2005 3:04 PM <br /> To: Fieldcamp, Dirk H <br /> Subject: Corrected FutureFactory Executive Summary <br /> Executive Summary <br /> FutureFactory Code Analysis <br /> presented July 28, 2005 <br /> Regulatory standard: <br /> •2005 International Building Code <br /> Assumptions: <br /> -The factory is a fully sprinklered building of Type IIB (noncombustible,nonrated), construction. <br /> -The factory is comprised of a series of interconnected unlimited area buildings complying with the <br /> provisions of Sections 507.3 and 503.1.3. <br /> -The building requires a building height exception in accordance with the provisions of Section 504.1. <br /> -Tool and manufacturing platforms are considered industrial equipment platforms in accordance with <br /> the provisions of Section 505.5. <br /> Focus of study: <br /> -Determine optimum code compliance strategy for the renovation of the multilevel, mixed-occupancy <br /> portions of the building. <br /> -Optimum compliance strategy is to minimize the noncomplying code aspects of the project while <br /> allowing for the greatest degree of flexibility in design and accommodating potential future expansion. <br /> 8/5/2005 <br />