Laserfiche WebLink
...... ........ _.._....,_.. ._................... _._ _............... .. _..... ..... .. .. <br /> INFORMATtON FaR DEV�I.OPER: <br /> Planning Department—Teresa Weldan—425.257.7281 <br /> 1. The Master Pian Develapment Matrix and Map shali be amended to include all updates to all <br /> buildings; including but nat limited to this project(the proposed expansion of the 40-92 building}, <br /> the 45-012 Static Test Facility,and the Composite Wing Fabrication Center.Submit the updated <br /> Master Plan Development Matrix and Map ta the Planning Department. . <br /> Engineering/Public Services Department--KirEc Broaks—425.257.8814 <br /> 2. Boeing shall complete and implement the Direct Count Program currently under development in <br /> conjunction with the City of Everett to address traffi�growth impacts_ <br /> 3. Canstruction permits, inspectians and final appravals are required forthis praject from City of <br /> Everett Permit Services. <br /> 4. A Pubiic Works Permit may be required for this project. Detailed drawings in accordance with City <br /> Design and Constructian Standards shall he submitted to the Public Warks Department,showing site <br /> parking layout, landscaping, utilities,storm drainage,temporary canstrucfion erosion cantral,and <br /> all required improvements in the public right-of-way. Public Works Department appraval afthese <br /> drawings is required prior to any permits being issued.All impr�vements shall be campleted, <br /> approved and warranted befare the Occupancy Permit is issued/final appraval isgranted. <br /> 5. Parking must be per City Zoning Code and City Design and Construction Standards for Develapment. <br /> 6. This project must comply with the current City of Everett Building Code and Sprinkler Ordinance. <br /> 7. Stormwater management on this site shall be provided in accordance with the City of Everett's <br /> current sfandarcls. <br /> 8. City streets and alleys are to be kept clear af dirt and debris at alE times during construction. Dust <br /> suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 9. Any necessary temparary erosion control rr�easures for construction activity must be operational <br /> priorto commencement ofany,,fearing ar ear#hwork. <br /> Fire Department—Jirn Ve�turo—425.257.8124 <br /> 10. Access—O.K.as shown on the site plan reviewec�. <br /> 1�.. Per Boeing Fire Department Field Inspectian-Fire lanes shall be prpvided as required in Everett <br /> Municipal Code 46.44. Fire lanes shall be identified by red curbs with white stenciling stating"NO <br /> PARKING- FIRE LANE" and vertical signs stating"NO PARKING—FIRE LANE—TOW AWAY ZONE-- <br /> EMC 46,28.130". Lacation shall be appraved 6y the Fire Code OfficiaL <br /> 12. Fire Hydrants-�ocations as pianned are acceptable. <br /> Addendum No.18 <br /> SEPA15-032-8oef ng Safe�y Pro,{notion Exhib€t Center <br /> 3� s <br />