My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-12 2018-09-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-12
>
3003 W CASINO RD BLDG 45-12 2018-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 1:08:21 PM
Creation date
4/30/2018 8:39:21 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-12
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Building Permit Plans ( ?cklist, pg. 2 ENV-CHK <br /> 2012 Washington State Energy Code Compliance orms for Commercial Buildings including R2&R3 over 3 stories and all R1 <br /> Project Address Boeing Everett Facility Date 9/4/2015 <br /> Applicability Code Location in Building <br /> (yes,no,na) Section Component Compliance information required in permit documents Documents Department Notes <br /> na C402.3.1 Vertical fenestration Provide calculation for total vertical fenestration area as percentage of gross <br /> maximum area above grade wall area <br /> na C402.3.1.2 Skylight maximum Provide calculation for total skylight area as percentage of gross roof area <br /> area <br /> Indicate U-factors,SHGC and VT values in fenestration schedules; <br /> C402.3.3 U-factors,SHGC <br /> and VT for all An area-weighted U-value may be used for all fenestration elements that <br /> na C402.3.1.3 qualify within the same fenestration category per Table C402.3; <br /> C303.1.3 fenestration <br /> assemblies Indicate if values are NFRC or default.If default then specify frame type, <br /> glazing layers,gap width,low-e coatings,gas-fill. <br /> Increased max. Provide calculations showing that percentage of overall conditioned floor area <br /> C402.3.1.1 vertical fenestration in the daylight zone is equal to or greater than 50%; <br /> na Chap.2 area with daylighting Indicate method of daylighting control in lighting equipment schedules; <br /> Definition controls <br /> Indicate VT of vertical fenestration is at least 1.1 times the rated SHGC <br /> Increased max. Indicate high performance U-factors and SHGC values in fenestration <br /> na C402.3.1,2 vertical fenestration schedules; <br /> area with high- An area-weighted U-value may be used for all fenestration elements that <br /> performance glazing qualify within the same fenestration category per this section <br /> na <br /> C402.3.3 Permanent shading Provide projection factor calculations(Equation C4-2)and associated SHGC <br /> C402.3.3.1 devices multipliers for north and non-north orientations <br /> Provide calculations for percentage of conditioned floor area located within a <br /> skylight daylight zone; <br /> Provide calculations for percentage of skylight area to daylight zone under <br /> na C402.3.2 Single story spaces skylights,OR; <br /> requiring skylights Provide calculations for percentage of overall skylight effective aperture <br /> (Equation C4-1); <br /> Indicate haze factor of skylight glazing material or diffuser <br /> AIR LEAKAGE <br /> Indicate location of continuous air barrier on plans and sections; <br /> C402.4.1.1 Air barrier <br /> yes construction and Provide details for all joints,transitions in materials,penetrations in air barrier <br /> C402.4.2 <br /> sealing and note method of sealing(caulked,Basketed,or other approved method) <br /> A200 and A500 <br /> Indicate locations of all stairway and shaft vents; <br /> Stairway and shaft Provide leakage rating of motorized dampers in mechanical equipment <br /> na C402.4.5.1 vents schedules; <br /> Indicate method of emergency operation-activation of fire alarm or <br /> interruption of power <br /> Outdoor air intakes, Indicate locations of all outside air intakes,exhausts and relief outlets, <br /> yes C402.4.5.2 exhausts and relief including those integral to mechanical equipment; <br /> openings Provide in mechanical equipment schedules leakage rating of dampers, <br /> identify whether motorized or gravity,and note any exceptions taken A60 and A61 <br /> na C402.4.8 Recessed lighting in Indicate IC rating of fixtures in lighting equipment schedules; <br /> building envelope Indicate method of sealing between light fixture housing and wall or ceiling <br /> na C402.4.6 Loading dock seals Indicate weather seal at cargo and loading dock doors <br /> Indicate locations and dimensions of vestibules; _ <br /> na C402.4.7 Vestibules For unconditioned vestibules,indicate which envelope assembly(interior or <br /> exterior)complies with the requirements for a conditioned space <br /> Indicate air barrier test method in accordance with ASTM E779 or approved <br /> equivalent; <br /> C402.4- Air barrier building Include the following requirements in project documents:(1)air barrier test <br /> na report shall be submitted to jurisdiction once test is completed;(2)if test <br /> .1.2.3 test <br /> results exceed 0.4 cfrn/ft2 at 0.3 in.wg then visually inspect air barrier and <br /> seal noted sources of leakage;(3)submit a follow-up report to jurisdiction <br /> noting corrective measures taken <br /> If"no"is selected for any question,provide explanation: <br /> End of Building Permit Plans Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.