My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> faithfully and completed under the Project schedule. When its representative is <br /> not personally present at the Project site, its designated alternate shall be <br /> available and shall have the authority to act in matters relating to this Contract. <br /> Where detailed construction requirements are not set forth in the Standard <br /> Specifications or these Special Provisions, the Contractor shall perform the Work <br /> of a quality comparable to the workmanship specified for other parts of the Work, <br /> from firms having established good reputations for similar Work, or by following <br /> industry standard practices. The Contractor shall perform all Work in compliance <br /> with and conforming to applicable building codes in effect at the time the Work is <br /> being performed. <br /> 1-05.18(3)E Safety <br /> The Contractor alone shall be responsible for safety on the job site, including, but <br /> not limited to, the safety of its and its Subcontractor's employees. The Contractor <br /> shall maintain the Project site and perform the Work in a manner that meets the <br /> City's responsibility under statutory and common law for the provision of a safe <br /> place to work. <br /> 1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents to threaten bodily injury or property damage, to <br /> intimidate or attempt to intimidate any person, or to assault or physically harass <br /> any person. Forbidden conduct includes, but is not limited to, threatening, <br /> appearing, or actually doing any of the following: pushing, shoving, striking, <br /> physically blocking a person or a person's vehicle, vandalism, malicious mischief, <br /> or any other act that a reasonable person would understand be intended to <br /> intimidate, cause personal injury, or cause property damage. Contractor shall <br /> remove from the job site any person reasonably under its control or direction who <br /> the Contractor or City reasonably believes violated this section. The lack of a <br /> request from the City or City's Representative to the Contractor to remove <br /> someone from the job site does not relieve the Contractor from its obligation to <br /> remove someone. <br /> 1-05.18(3)G Weapons Forbidden <br /> Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents or representatives to carry or possess, openly or <br /> concealed, explosives or weapons on the job site, except: (a) such explosives are <br /> as reasonably required for performance of the Work, such as those necessary for <br /> blasting or demolition work called for by the Contract Documents or (b) <br /> commissioned law enforcement officers or security personnel under authority of <br /> their commission. A weapon is any object, instrument or chemical that is (1) <br /> designed in such a manner to inflict harm or injury to another person; or (2) any <br /> item used in a manner threatening harm or injury to another person. Weapons <br /> include, but are not limited to, firearms, dangerous knives, dangerous chemicals, <br /> tear gas, martial arts weapons, blackjacks or other weapons. Further, weapons <br /> should include those described in EMC Chapter 10.78. Possession of mace, <br /> pepper spray or the like for defensive purposes is not a violation of this policy. <br /> Contractor shall remove from the job site any person reasonably under its control <br /> or direction who the Contractor or City reasonably believes violated this section. <br /> The lack of a request from the City or City's Representative to the Contractor to <br /> remove someone from the job site does not relieve the Contractor from its <br /> obligation to remove someone. <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—69 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.