My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.18(3)H Safety Standards <br /> The Contractor shall comply with Section 107 of the Contract Work Hours and I <br /> Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of <br /> Labor Regulations (29 CFR, Part 5). Under this Section, the Contractor shall not <br /> require any laborer or mechanic to work in surroundings or under working <br /> conditions that are unsanitary, hazardous, or dangerous to its health and safety as <br /> determined under construction, safety, and health standards promulgated by the <br /> Secretary of Labor. These requirements do not apply to the purchase of supplies <br /> or materials or articles ordinarily available on the open market, or contracts for <br /> transportation or transmission of intelligence. <br /> 1-05.18(3)1 Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible <br /> obstruction to traffic and inconvenience to the general public, business, <br /> organizations and residents in the vicinity of the Work and to reasonably protect <br /> persons and property. No roads or street shall be closed to the public except with <br /> the permission of the City's Representative and the proper governmental authority. <br /> Fire hydrants on or adjacent to the Work shall be accessible to firefighting <br /> equipment. Temporary provisions shall be made by the Contractor for the use of <br /> sidewalks, private and public driveways and proper functioning of gutters, sewer <br /> inlets, drainage ditches and culverts, irrigation ditches and natural water courses. <br /> 1-05.19 City-Contractor Coordination <br /> 111 <br /> (******) <br /> 1-05.19(1) Suggestions to Contractor <br /> Nothing in these Contract Documents requires the City's Representative to provide the I <br /> Contractor with direction or advice on how to do the Work, construction practices, or <br /> means and methods. If the City's Representative approves, suggests or recommends <br /> any construction practice, means, method or manner for doing the Work or producing <br /> materials, the approval or recommendation shall not: (A) guarantee that following the <br /> method or manner will result in compliance with the Contract Documents; (B) relieve <br /> the Contractor of any risks or obligations under the Contract Documents; or (C) create <br /> liability by the City to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the Work or Contract <br /> requirements by the City or the City's Representative to the Contractor but not <br /> specified or required, if adopted or followed by the Contractor in whole or in part, shall111 <br /> be used at the risk and responsibility of the Contractor. The City and the City's <br /> Representative assume no responsibility therefore and in no way will be held liable for <br /> any defects in the Work which may result from or be caused by use of such plan or <br /> method of Work. <br /> 1-05.19(2) Meetings with City <br /> The Contractor shall have its duly authorized representative attend periodic I <br /> informational meetings with the City's Representative and City staff, as reasonably <br /> required by the City. <br /> Contractor, City, and City's Representative shall meet as often as determined by the <br /> City's Representative, but no less often than once each month. The purpose of the <br /> meeting is to review Project status in relation to the construction schedule; review <br /> value of Work completed during the previous month; and, if applicable, review <br /> Contractor's plans to return Project status to that required by the schedule. If <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> - Evergreen Way Rebid <br /> WO No—UP3612 SP—70 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.