My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> requested by the City or City's Representative, the Contractor shall submit a written <br /> progress report within five days following this meeting, comprising: <br /> The current construction schedule indicating percent complete, actual completion or <br /> start dates since the previous review, the estimated remaining duration for each activity <br /> in progress, Schedule of Values update, and narrative summary. <br /> Reasons any activities are behind schedule and the corrective steps being taken. <br /> 1-05.19(3) Cooperation with Others <br /> ' The Contractor agrees to permit entry to the work site by the City, its employees or <br /> other contractors performing Work on behalf of the City. The Contractor shall afford to <br /> the City, other contractors and their employees, reasonable facilities and cooperation <br /> and arrange its work and dispose of its materials in such a manner as to not interfere <br /> with the activities of the City or of others upon the site of Work. The Contractor shall <br /> promptly make good Contractor-caused injury or damage to persons or property that <br /> may be sustained by other contractors or employees of the City. The Contractor shall <br /> join its Work to that of others and perform its Work in proper sequence in relation to <br /> that of others. <br /> If requested by the Contractor, the City will arrange meetings with other contractors <br /> performing Work on behalf of the City to plan coordination of construction activities. <br /> The Contractor shall inform itself of the planned activities of other contractors and will <br /> coordinate its Work with the other contractors. <br /> Contractor shall notify the City of problems, interference or any difficulty with other <br /> contractors or workers engaged by the City. The Notice shall be sufficiently prompt <br /> and specific so as to allow the City to mitigate or avoid increased costs, time of <br /> performance, damages or injury. Contractor's failure to provide such Notice in a timely <br /> way shall be deemed a waiver and release of any and all Contract Claims relating to, <br /> arising out of, or caused by, any alleged interference, difficulty or problem with another <br /> contractor or worker engaged by the City. <br /> 1-06 CONTROL OF MATERIAL <br /> Supplement Section 1-06 as follows: <br /> References to materials shall also mean Contractor furnished Equipment, if any, as <br /> specified in these Special Provisions. <br /> 1-06.1 Approval of Materials Prior to Use <br /> 1 Revise the first paragraph of 1-06.1 to read as follows: <br /> Prior to use, Contractor shall notify the Engineer of all proposed materials. Contractor <br /> may use the Qualified Product List (QPL) and the Aggregate Source Approval (ASA) <br /> Database. Contractor shall use the Request for Approval of Material (RAM) form. <br /> Supplement 1-06.1 by adding the following: <br /> Provide product data, when specified, in accordance with 1-05.3(1) SUBMITTALS of <br /> these Special Provisions for inspecting, testing, operating, or maintaining Equipment <br /> and materials supplied as part of the Work. Unless otherwise specified, such data <br /> shall be provided at the time the referenced material or Equipment is delivered to the <br /> job site. Provide data as specified and include, unless otherwise specified, but not be <br /> limited to shop drawings, erection drawings, reinforcing steel schedules, testing and <br /> adjusting instructions, operations manuals, maintenance procedures, parts lists, and <br /> record drawings. Provide data as part of the Work under this Contract and its <br /> acceptability will be determined by the City in its sole discretion. <br /> Further supplement 1-06.1 by adding the following: <br /> Water Main Replacement"Q" Division 1 -GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No-UP3612 SP-71 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.