My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.23(1) Construction Under Traffic <br /> Supplement 1-07.23(1) by adding the following: <br /> Evergreen Way lane closure restrictions: <br /> One lane south of Station 32+00- 11:00 a.m to 7:00 p.m., Monday - Friday <br /> One lane north of Station 32+00- 8:30 a.m. to 7:00 p.m., Monday- Friday <br /> Two lanes- 8:30 a.m. to 7:00 p.m., Monday - Friday <br /> E. Casino Rd lane closure restrictions: <br /> 1 8:30 a.m. to 7:00 p.m., Monday- Friday <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the <br /> Contractor in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> 1 p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Provide a uniformed off-duty Police Officer to control traffic in critical situations as <br /> determined by the Engineer. The uniformed officer shall be paid under contract <br /> item "Traffic Control - Off-Duty Police Officer." <br /> Notify the local Fire, Police and Engineering Departments before the beginning of <br /> each phase of construction so that these agencies may re-route their emergency <br /> vehicles around the construction zone. The non-emergency phone number for <br /> Everett Police is 258-2484, for Fire Dispatch is 257 8757, and for Public Works <br /> Engineering is 257-8800. <br /> Notify City of Everett Transit at 425-257-8984 and Community Transit at 425-348- <br /> 7100 of all street closures or delays at least 24 hours in advance to enable <br /> rerouting of buses. <br /> Notify the property owners at least 72 hours in advance to enable them to remove <br /> vehicles parked in the vicinity of Work. Towing vehicles shall be the responsibility of <br /> the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> All business driveways shall remain open except as necessary to permit <br /> curing of construction materials or for short periods of time as required for <br /> ' excavations. However, at least one driveway per business shall remain open <br /> to vehicular traffic at all times unless otherwise approved by the Engineer and <br /> affected property owner in writing. <br /> Signs and barricades shall be supplemented by lanterns or flasher units <br /> during the hours of darkness. <br /> Water Main Replacement"Q" Division 1 -GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No-UP3612 SP-87 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.