My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> restrictions as provided for the drivers of private vehicles. <br /> Conduct the Work, at all time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as <br /> possible. Keep the streets, sidewalks and private driveways open except for <br /> the brief periods when actual Work is being done. <br /> 1-07.24 Rights of Way <br /> Deletel-07.24 and substitute the following: <br /> Street right of way lines, limits of easements, and limits of construction permits are <br /> indicated on the Plans. The Contractor's construction activities shall be confined within <br /> these limits, unless arrangements for use of private property are made. <br /> Generally, the City will have obtained, prior to bid opening, all rights of way and <br /> easements, both permanent and temporary, necessary for carrying out the Work. <br /> Exceptions to this are noted on the Plans. <br /> Whenever any of the Work is accomplished on or through property other than public <br /> right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 111 <br /> easement agreement obtained by the City from the owner of the private property. <br /> Copies of the easement agreements may be included in the Contract Documents or <br /> made available to the Contractor as soon as practical after they have been obtained by <br /> the Engineer. <br /> The Contractor shall not proceed with any portion of the Work in areas where right of <br /> way, easements or rights of entry have not been acquired until the Engineer certifies to <br /> the Contractor that the right of way or easement is available or that the right of entry I <br /> has been received. If the Contractor is delayed due to acts of omission on the part of <br /> the City in obtaining easements, rights of entry or right of way, the Contractor will be <br /> entitled to an extension of time. The Contractor agrees that Delay resulting from City <br /> obtaining easement or right of entry or right of way shall not be a breach of Contract. <br /> Each property owner shall be given 48 hours notice prior to entry by the Contractor. <br /> This includes entry onto easements and private property where private improvements <br /> must be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the <br /> City, any additional land and access thereto that the Contractor may desire for <br /> temporary construction facilities, storage of materials, or other Contractor needs. <br /> However, before using any private property, whether adjoining the Work or not, the <br /> Contractor shall file with the Engineer a written permission of the private property <br /> owner, and, upon vacating the premises, a written release from the property owner of111 <br /> each property disturbed or otherwise interfered with by reasons of construction <br /> pursued under this Contract. The statement shall be signed by the private property <br /> owner, or proper authority acting for the owner of the private property affected, stating <br /> 111 <br /> that permission has been granted to use the property and all necessary permits have <br /> been obtained or, in the case of a release, that the restoration of the property has been <br /> satisfactorily accomplished. The statement shall include the parcel number, address, <br /> and date of signature. Written releases shall be filed with the Engineer before the <br /> Completion Date will be established. <br /> 1-07.27 No Waiver of State's Legal Rights <br /> Delete 1-07.27 and substitute the following: <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—88 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.