My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> time 8-hour working period for the Contract shall be established at the preconstruction <br /> conference or prior to the Contractor commencing the Work. <br /> When connecting to existing water mains and services are required, the City will obtain <br /> all necessary permissions and the normal hours of work shall be any consecutive 8- <br /> hour period between 6:00 p.m. and 7:00 a.m. Refer to 7-09.3(19)A regarding night or <br /> weekend connection work time requirements. <br /> If a Contractor is required to or desires to perform Work on holidays, weekends, or <br /> before 7:00 a.m. or after 10:00 p.m. on any weekday, the Contractor shall apply in <br /> writing to the Engineer for permission to work such times. Permission to work longer <br /> than an 8-hour period between 7:00 a.m. and 6:00 p.m. is not required. Such requests <br /> shall be submitted to the Engineer no later than noon on the working day prior to the <br /> day for which the Contractor is requesting permission to work, unless a noise variance <br /> will be required. In such case provide request a minimum of 30 days prior to <br /> performing the work in accordance with 1-07.1(1) NOISE. <br /> Permission to work Saturdays, Sundays, holidays or other than the agreed upon I <br /> normal straight time working hours Monday through Friday may be given subject to <br /> certain other conditions set forth by the City or Engineer. These conditions may <br /> include, and not be limited to; requiring the Contractor to reimburse the City for the <br /> costs in excess of straight-time costs for City employees and necessary assistants who <br /> worked during such times, on non-Federal aid projects. Assistants may include, and <br /> are not be limited to, survey crews; personnel from the City's material testing lab; <br /> inspectors; and other City employees when in the opinion of the Engineer, such work <br /> necessitates their presence. The work performed on Saturdays, Sundays, and <br /> holidays will be considered as working days with regards to the Contract Time; and <br /> considering multiple work shifts as multiple working days with respect to Contract Time I <br /> even though the multiple shifts occur in a single 24-hour period. <br /> 1-08.0(3) Reimbursement for Overtime Work of City Employees and <br /> Assistants I <br /> Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br /> an 8-hour work shift on a regular working day, as defined in the Standard <br /> Specifications, such work shall be considered as overtime work. On all such overtime <br /> work an inspector will be present, and a survey crew may be required at the discretion <br /> of the Engineer. If such work is the result of Contractor's inability to complete work or <br /> coordinate materials, equipment and labor in accordance with agreed schedule, then <br /> the City may deduct from amounts due or to become due to the Contractor for the <br /> costs in excess of the straight-time costs for employees and assistants of the City <br /> required to work overtime hours. <br /> The Contractor by these specifications does hereby authorize the Engineer to deduct <br /> such costs from the amount due or to become due to the Contractor. <br /> 1-08.1 Subcontracting <br /> Delete the eighth paragraph in 1-08.1 and substitute the following: <br /> On all projects funded with City funds only, the Contractor shall certify to the actual <br /> amounts paid Disadvantaged, Minority, or Women's Business Enterprise firms that <br /> were used as subcontractors, lower tier subcontractors, manufacturers, regular <br /> dealers, or service providers on the Contract. This certification shall be submitted to <br /> the Engineer on WSDOT form 140-542 within 20 calendar days after physical <br /> completion of the Contract. <br /> Supplement 1-08.1 by adding the following: <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—90 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.