My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.27 No Waiver of City's Legal Rights <br /> (******) <br /> The City shall not be precluded or estopped by any measurement, estimate, or certificate <br /> made either before or after the completion and acceptance of the Work and payment <br /> therefor from showing the true amount and character of the Work performed and materials <br /> furnished by the Contractor, or from showing that any such measurement, estimate, or <br /> certificate is untrue or incorrectly made, or that the Work or materials do not conform in fact <br /> to the Contract. The City shall not be precluded or estopped, notwithstanding any such <br /> measurement, estimate, or certificate, and payment in accordance therewith, from <br /> recovering from the Contractor and the Sureties such damages as it may sustain by reason <br /> of the Contractor's failure to comply with the terms of the Contract. Neither the acceptance <br /> by the Engineer nor any payment for the whole or any part of the Work, nor any extension <br /> of time, nor any possession taken by the City shall operate as a waiver of any portion of the <br /> Contract or of any power herein reserved or any right to damages herein provided, or bar <br /> recovery of any money wrongfully or erroneously paid to the Contractor. A waiver of any <br /> breach of the Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.0 Preliminary Matters <br /> 1-08.0(1) Preconstruction Conference <br /> Prior to the Contractor beginning the Work, a preconstruction conference will be held <br /> between the Contractor, the Engineer and such other interested parties as may be <br /> invited. The purpose of the preconstruction conference will be: <br /> 1. To review the initial progress schedule; <br /> 2. To establish a working understanding among the various parties associated or <br /> affected by the Work; <br /> 3. To establish and review, at a minimum, procedures for progress payment, <br /> notifications, approvals, and submittals; <br /> 4. To establish normal working hours for the Work; <br /> 5. To review safety standards and traffic control; and <br /> 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise approved by the City, the normal <br /> straight time working hours for the Contract shall be any consecutive 8-hour period <br /> between 7:00 a.m. and 6:00 p.m. of a working day with a maximum 1-hour lunch break <br /> and a 5-day work week. Should Contractor elect to work on a holiday or weekend, <br /> those normal working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight <br /> Water Main Replacement"Q" Division 1 -GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No-UP3612 SP-89 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.