Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 5. Maintenance, restoration and/or relocation, if required, of existing culverts, storm <br /> drainage pipe, other utilities and structures affected by construction that are to remain. <br /> 6. Temporary and permanent thrust blocking and dead man blocks, and temporary and <br /> permanent restraint systems. <br /> 7. Ethafoam pads or sand backfill between water main and other pipes. <br /> 8. Pressure and purity testing of all water mains and shall include providing temporary <br /> blow-offs, backflow prevention, air gap apparatus, flushing, and disinfecting as <br /> necessary for testing in accordance with 7-09.3(24) of these Special Provisions and <br /> COE Standard Drawing No. 526. <br /> 9. Extra depth, including excavation, backfill and compaction required to clear known <br /> buried utilities or other known obstacles. <br /> 10. Work required to avoid unexpected or unforeseen obstacles shall be paid for under the <br /> Force Account item. <br /> Bid Item 16 - Gate Valve, 6-Inch <br /> Bid Item 17 - Gate Valve, 8-Inch I <br /> Bid Item 18 - Gate Valve, 12-Inch <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Gate Valves, -Inch shall constitute full compensation for all <br /> labor, materials, tools and equipment necessary and incidental to furnish and install valves <br /> complete in place on the water main, including but not limited to, dewatering; removal and <br /> disposal of existing curb and gutter, and sidewalk; excavation, removal, hauling, and <br /> disposal of excavated materials; furnishing, jointing, and installing valves and valve boxes <br /> with extensions if necessary; installing temporary concrete thrust blocks; restraint systems; <br /> painting; flushing and disinfecting; furnishing, installing, compacting, and testing bedding <br /> and backfill materials; constructing asphalt concrete pad around valve box if necessary; <br /> cleanup; and any additional work, materials, and equipment required to install the valves <br /> and assembly, except as included in other unit price bids. <br /> Bid Item 19 - Fire Hydrant Assembly <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit price per each shall be full compensation for all work to furnish and install fire <br /> hydrant assemblies in accordance with COE Standard Drawing No. 507 including, yet not <br /> limited to, all costs for clearing and grubbing; excavation, removal, haul and disposal of <br /> excavated materials; furnishing, installing, testing, and disinfecting pipe, fire hydrant valves <br /> and fittings, and appurtenances; shoring; dewatering; furnishing, installing and compacting <br /> bedding and backfill materials; plastic film wrap; and thermoplastic powder coating required <br /> for the complete installation of the hydrant assembly as specified. I <br /> Work and materials to be included with this bid item removal or salvage, handling and <br /> disposal of the existing hydrant and disposal of or abandoning in place pipe, fittings, and <br /> valve. I <br /> Bid Item 20 - Assist COE Water Operations, Connection to Existing 8-inch Water Main <br /> Bid Item 21 - Assist COE Water Operations, Connection to Existing 12-inch Water <br /> Main <br /> Bid Item 22 - Assist COE Water Operations, Connection to Existing 24-inch Water <br /> Main <br /> Measurement and Payment: Unit Price per Each (EA) <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP-8 <br /> I <br />