Laserfiche WebLink
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> not to exceed a depth of 12 inches or as required by the Engineer and <br /> replace the unstable material with Foundation Material Class A or B. <br /> Place Foundation Material Class A or B in layers not more than six inches <br /> thick and compact to minimum of 90-percent maximum density as determined <br /> by 2-03.3(14)D. <br /> Dispose of unsuitable material removed to make room for foundation material <br /> by hauling to a waste site obtained and provided by the Contractor in <br /> accordance with 2-03.3(7)C. <br /> 2-09.3(1)D Disposal of Excavated Material <br /> Delete the second paragraph in 2-09.3(1)D and substitute the following: <br /> Include all costs for disposing of excavated material, whether within the <br /> Project limits or hauled to a disposal site, with other Bid items in the Proposal. <br /> There will be no direct compensation made for hauling and disposal. <br /> Disposal of excavated material shall meet the requirements of 2-03.3(7)C. <br /> 2-09.3(1)E Backfilling <br /> Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br /> strength not to exceed 300-psi. Provide wet or flowable CDF with <br /> consistency having approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. <br /> Use wet, or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material, <br /> gravel borrow, washed sand or crushed surfacing top course, the respective <br /> limits for trench width or backfill dimensions shall be approved by the <br /> Inspector. <br /> 2-09.4 Measurement <br /> Delete all paragraphs in 2-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 2-09.5 Payment <br /> Delete all paragraphs in 2-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for "Structure Excavation" in the Proposal, all Work in this <br /> section shall be included with the respective Bid Items of the Contract with no direct <br /> compensation made. <br /> 2-11 TRIMMING AND CLEANUP <br /> 2-11.3 Construction Requirements <br /> Supplement 2-11.3 by adding the following after item 6: <br /> 1 7. Keep City streets clean and free from mud, dirt and other debris. <br /> Further supplement 2-11.3 by adding the following: <br /> Water Main Replacement"Q" Division 2-EARTHWORK February 9,2018 <br /> -Evergreen Way Rebid <br /> WO No.-UP3612 SP-137 <br /> I <br />