My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Keep the Project site in a neat and orderly condition during the process of construction <br /> with as little disruption to the adjoining properties as practical under the conditions. I <br /> Promptly and as often as needed cleanup debris resulting from Contractor's operations <br /> from drainage facilities such as inlets, catch basins, culverts and open ditches. <br /> Remove and dispose of all construction stakes. I <br /> Upon Project completion, clean Project area and neatly dress slopes to present a <br /> uniform appearance blending into the contour of adjacent properties. Remove trash of <br /> all kinds resulting from construction operations. <br /> 2-11.4 Measurement <br /> Delete all paragraphs in 2-11.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-11.5 Payment <br /> Delete all paragraphs in 2-11.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for "Trimming and Cleanup" in the Proposal, all Work in this <br /> section shall be included with other Work with no direct compensation made. <br /> I <br /> I <br /> I <br /> t <br /> I <br /> I <br /> I <br /> I <br /> Water Main Replacement"Q" Division 2-EARTHWORK February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP-138 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.