My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 — DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATER MAINS, AND CONDUITS <br /> 7-04 STORM SEWERS <br /> 7-04.1 Description <br /> Revise the first paragraph in 7-04.1 to read as follows: <br /> This Work consists of constructing storm sewers to lines and grades as shown on the <br /> Plans and in accordance with COE Standard Drawings, the Standard Specifications <br /> and these Special Provisions. <br /> Supplement 7-04.1 as follows: <br /> 7-04.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-04.2 Materials <br /> Delete the first and second paragraphs in 7-04.2 and substitute the following: <br /> Materials shall meet the requirements of the following sections: <br /> Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br /> & Joints <br /> Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br /> & Joints <br /> Corrugated Polyethylene Storm 9-05.20 Standard Specifications <br /> Sewer Pipe & Joints <br /> Revise the last paragraph in 7-04.2 to read as follows: <br /> When schedule A or B storm sewer pipe is specified in the Plans, provide the specified <br /> schedule and diameter of either concrete, PVC, or PE/PP materials shown in the <br /> Storm Sewer Pipe Schedules Table. <br /> Contact the Olympia Service Center Materials Laboratory to determine if joints have <br /> been approved for pipe diameters larger than those listed. <br /> On the web at: http://www.wsdot.wa.gov/biz/mats/QPL/QPI.cfm <br /> Or by mail at: <br /> P.O. Box 167 <br /> Olympia, WA 98507-0167 <br /> (360) 709-5442 <br /> 7-04.4 Measurement <br /> Delete the first paragraph of 7-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-04.5 Payment <br /> Delete all paragraphs in 7-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Water Main Replacement"Q" Division 7-STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.-UP3612 SP-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.