Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 — DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATER MAINS, AND CONDUITS <br /> 7-04 STORM SEWERS <br /> 7-04.1 Description <br /> Revise the first paragraph in 7-04.1 to read as follows: <br /> This Work consists of constructing storm sewers to lines and grades as shown on the <br /> Plans and in accordance with COE Standard Drawings, the Standard Specifications <br /> and these Special Provisions. <br /> Supplement 7-04.1 as follows: <br /> 7-04.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-04.2 Materials <br /> Delete the first and second paragraphs in 7-04.2 and substitute the following: <br /> Materials shall meet the requirements of the following sections: <br /> Solid Wall PVC Storm Sewer Pipe 9-05.12(1) Special Provisions <br /> & Joints <br /> Profile Wall PVC Storm Sewer Pipe 9-05.12(2) Standard Specifications <br /> & Joints <br /> Corrugated Polyethylene Storm 9-05.20 Standard Specifications <br /> Sewer Pipe & Joints <br /> Revise the last paragraph in 7-04.2 to read as follows: <br /> When schedule A or B storm sewer pipe is specified in the Plans, provide the specified <br /> schedule and diameter of either concrete, PVC, or PE/PP materials shown in the <br /> Storm Sewer Pipe Schedules Table. <br /> Contact the Olympia Service Center Materials Laboratory to determine if joints have <br /> been approved for pipe diameters larger than those listed. <br /> On the web at: http://www.wsdot.wa.gov/biz/mats/QPL/QPI.cfm <br /> Or by mail at: <br /> P.O. Box 167 <br /> Olympia, WA 98507-0167 <br /> (360) 709-5442 <br /> 7-04.4 Measurement <br /> Delete the first paragraph of 7-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-04.5 Payment <br /> Delete all paragraphs in 7-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Water Main Replacement"Q" Division 7-STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.-UP3612 SP-145 <br />