My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS <br /> 7-05.1 Description <br /> Revise the first paragraph in 7-05.1 to read as follows: <br /> This Work consists of constructing manholes, inlets, drywells, and catch basins and <br /> connecting to existing Structures of the types and sizes designated in accordance with <br /> the Plans, these Special Provisions, the Specifications, and the COE Standard <br /> Drawings, in conformity with the lines and grades staked. <br /> Further supplement 7-05.1 as follows: <br /> 7-05.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-05.2 Materials <br /> Supplement 7-05.2 by adding the following at the end of the material list: <br /> Mortar, nonshrink 9-20.3(2) Standard Specifications I <br /> Commercial Concrete 6-02.3(2)B Standard Specifications <br /> Watertight Connection Boots 9-05.30 Special Provisions <br /> Flexible Couplings 9-05.40 Special Provisions <br /> 7-05.3 Construction Requirements <br /> Delete the tenth paragraph in 7-05.3. <br /> Revise the eleventh paragraph in 7-05.3 to read as follows: 1 <br /> Provide Kor-N-Seal, or equal, watertight flexible pipe to manhole connectors for pipes <br /> up to 48-inch diameter connecting to new sanitary sewer manholes. Place no pipe <br /> joint in PVC or HDPE pipe within 10-feet of the outside face of the manhole. <br /> Revise the last sentence in the sixteenth paragraph in 7-05.3 to read as follows: <br /> Provide manholes, inlets, and catch basins that upon final acceptance of the Work <br /> conforms to the following COE Standard Drawings requirements: <br /> 1. Manholes No. 605A, 605B and 605C as applicable. <br /> 2. Inlets No. 401 <br /> 3. Catch Basins No. 402, 403 and 404 as applicable. <br /> 7-05.3(1) Adjusting Manholes and Catch Basins to Grade <br /> Delete both paragraphs of 7-05.3(1) and substitute the following: <br /> Adjust manholes, catch basins and other structures to final grade after completing 111 <br /> pavement operations. Carefully re-establish the center of each structure from <br /> Contractor's previously established references. <br /> Cut pavement in neat circle having a minimum diameter of 2-feet beyond the 111 <br /> casting cover. Remove pavement and base material, maintaining the neat circle, <br /> to permit casting and frame removal. Adjust casting and frame to proper grade. <br /> Place cast iron frame on concrete blocks or concrete adjusting rings and wedge <br /> up to the desired grade using plastic wedges. Wood or metal wedges are not <br /> allowed. The Backfill around finished casting frame to within 1-1/2 inches of <br /> finished pavement surface using commercial concrete. I <br /> After concrete has set a full 24-hours, paint the edges of the asphalt concrete <br /> pavement and the outer edge of the casting with hot asphalt cement. Place hot <br /> asphalt concrete to match finished pavement surface and compact with hand <br /> tampers and a patching roller. Asphalt concrete and cement concrete shall be <br /> considered incidental to the unit price of the structure being adjusted. <br /> Water Main Replacement"Q" Division 7—STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—146 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.