Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Match the new patch with existing paved surface for texture, density, and <br /> uniformity of grade. Carefully paint the joint between the patch and the existing <br /> pavement shall then be carefully painted with hot asphalt cement or asphalt <br /> emulsion and immediately cover with dry paving sand before the asphalt cement <br /> solidifies. <br /> Thoroughly mortar and plaster the inside throat of the structure. <br /> 7-05.4 Measurement <br /> Delete all paragraphs of 7-05.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05.5 Payment <br /> Delete all paragraphs of 7-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.1 Description <br /> Further supplement 7-08.1 as follows: <br /> 7-08.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide Type 3E Working Drawings for dewatering plans, if any. <br /> 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> Controlled Density Fill 2-09.3(1)E Special Provisions <br /> Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br /> 7-08.3 Construction Requirements <br /> 7-08.3(1) Excavation and Preparation of Trench <br /> 7-08.3(1)A Trenches <br /> Revise the second paragraph in 7-08.3(1)A and to read as follows: <br /> Excavate trench in accordance with COE Standard Drawing No 614. <br /> Delete the second sentence in the third paragraph in 7-08.3(1)A and substitute the <br /> following: <br /> Contractor may excavate above the top of the pipe zone only as wide as <br /> necessary to meet OSHA requirements. <br /> 7-08.3(1)C Bedding the Pipe <br /> Delete the second and third paragraphs in 7-08.3(1)C and substitute the following: <br /> ' Provide pipe zone bedding in accordance with COE Standard Drawing 614 <br /> and 615. <br /> If the Engineer determines the material existing in the trench bottom is <br /> satisfactory for bedding the pipe, then the bedding material specified in the <br /> Water Main Replacement"Q" Division 7—STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—147 <br />