I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> pumping from the excavated area, that may result from negligence, inadequate or <br /> improper installation, maintenance and operation of the dewatering system, or <br /> ' mechanical or electrical failure of the dewatering system shall be Contractor's <br /> responsibility to repair at no cost to the City. <br /> Trench dewatering shall be included with the Work required for Sewer Pipe, <br /> ' Manholes, Side Sewer Connections, Storm Drain, Catch Basins, Utility <br /> Restoration or other excavation activity performed as part of this Contract with no <br /> direct compensation made. <br /> 7-08.3(2) Laying Pipe <br /> 7-08.3(2)A Survey Line and Grade <br /> Delete both paragraphs of 7-08.3(2)A and substitute the following: <br /> Provide surveys required to construct the sewer line including, but not limited <br /> to, alignment stakes, offset stakes, grade hubs, and intermediate staking. <br /> Use main survey control points shown on the Plans, unless Engineer directs <br /> otherwise. If a Bid item for "Surveying" is not listed in the Proposal, then this <br /> item shall be included with the Work with no direct compensation made. <br /> Provide laser control equipment approved by the Engineer for setting pipe <br /> grades. <br /> 7-08.3(3) Backfilling <br /> Delete the first paragraph of 7-08.3(3) and substitute the following: <br /> Perform trench backfilling only after inspection and approval of the installed pipe <br /> bedding zone backfill. Refer to COE Standard Drawing No. 614, 615, 620 and the <br /> Plans for typical trench section backfill and compaction requirements. <br /> If the Engineer determines native material is not suitable for use as trench backfill, <br /> use "Gravel Borrow" conforming to 9-03.14(1) of the Standard Specifications. <br /> If there is an excess of suitable backfill material obtained from trench excavation <br /> at one location on the project, use it at other locations on the project or dispose of <br /> at an approved disposal site. The cost of transporting the excess backfill material <br /> is considered incidental to the Contract with no direct compensation made. <br /> Use Controlled Density Fill in lieu of select trench backfill for fill above pipe zone <br /> at street crossings and as directed by the Engineer in other areas where in order <br /> to prevent pavement patch settlement requires high density backfill placement or <br /> effective backfill compaction is not possible. <br /> Delete the first sentence of the third paragraph. <br /> Delete the third and fourth sentences of the fourth paragraph. <br /> 7-08.3(4) Plugging Existing Pipe <br /> Delete the first paragraph of 7-08.3(4) and substitute the following: <br /> Where shown on the plans to plug and seal existing water main, sanitary sewer <br /> 111 and storm drainage pipe plug existing pipe a minimum distance of 2-feet from the <br /> inlet end with cement grout and abandon in place. <br /> 7-08.4 Measurement <br /> Delete all paragraphs in 7-08.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08.5 Payment <br /> Delete all paragraphs in 7-08.5 and substitute the following: <br /> Water Main Replacement"Q" Division 7—STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—149 <br />