Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09 WATER MAINS <br /> 7-09.1 Description <br /> Revise the first paragraph in 7-09.1 to read as follows: <br /> This Work consists of constructing water mains in accordance with the Plans, the <br /> Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br /> the location shown on the Plans. <br /> 7-09.1(1) Definitions <br /> 7-09.1(1)D Pipe Zone Backfill I <br /> Revise the first paragraph in 7-09.1(1)D to read as follows: <br /> Pipe zone backfill includes material placed a minimum of 6-inches below the <br /> bottom of pipe up to a minimum of 12-inches above the top of pipe as shown <br /> on COE Standard Drawing No. 615. <br /> Supplement 7-09.1(1) by adding the following: <br /> 7-09.1(1)F Earthquake Joint System <br /> As required on the Plans and in these Specifications, provide a ductile iron <br /> system within 35th Street between Federal Avenue and Lombard Avenue that <br /> delivers up to five degree pipe joint deflection, three degree casting joint <br /> deflection, eight degree combined assembly deflection and +1- 2.4 inches of <br /> longitudinal expansion or contraction from midpoint. <br /> Supplement 7-09.1 as follows: ' <br /> 7-09.1(2) Submittals <br /> (******) <br /> Provide submittal showing ERDI pipe manufacturer's recommended fitting placement <br /> for ERDI pipe system in accordance with the Plans and these Special Provisions. <br /> Note also whether Earthquake System piping either fully open, fully closed, or midpoint <br /> position in accordance with design of the Earthquake System piping manufacturer. <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-09.2 Materials <br /> Substitute the following for the corresponding material in the material list in 7-09.2: i <br /> Ductile Iron Pipe (non-earthquake resistant) 9-30.1(1) Special Provisions <br /> Polyethylene Encasement 9.30.1(2) Special Provisions <br /> Ductile Iron Pipe (earthquake resistant) 9-30.1(3) Special Provisions111 <br /> Fittings 9-30.2 Special Provisions <br /> Restrained Joints 9-30.2(6) Special Provisions <br /> Bolted, Sleeve—Type Couplings 9-30.2(7) Special Provisions <br /> for Plain End Pipe <br /> Aggregates: <br /> Pipe Zone Backfill 9-03.22 Special Provisions , <br /> Controlled Density Fill 2.09.3(1)E Special Provisions <br /> 7-09.3 Construction Requirements <br /> 7-09.3(5) Grade and Alignment I <br /> Revise the first sentence of the third paragraph in 7-09.3(5) to read as follows: <br /> Water Main Replacement"Q" Division 7—STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—150 , <br />