My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09 WATER MAINS <br /> 7-09.1 Description <br /> Revise the first paragraph in 7-09.1 to read as follows: <br /> This Work consists of constructing water mains in accordance with the Plans, the <br /> Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br /> the location shown on the Plans. <br /> 7-09.1(1) Definitions <br /> 7-09.1(1)D Pipe Zone Backfill I <br /> Revise the first paragraph in 7-09.1(1)D to read as follows: <br /> Pipe zone backfill includes material placed a minimum of 6-inches below the <br /> bottom of pipe up to a minimum of 12-inches above the top of pipe as shown <br /> on COE Standard Drawing No. 615. <br /> Supplement 7-09.1(1) by adding the following: <br /> 7-09.1(1)F Earthquake Joint System <br /> As required on the Plans and in these Specifications, provide a ductile iron <br /> system within 35th Street between Federal Avenue and Lombard Avenue that <br /> delivers up to five degree pipe joint deflection, three degree casting joint <br /> deflection, eight degree combined assembly deflection and +1- 2.4 inches of <br /> longitudinal expansion or contraction from midpoint. <br /> Supplement 7-09.1 as follows: ' <br /> 7-09.1(2) Submittals <br /> (******) <br /> Provide submittal showing ERDI pipe manufacturer's recommended fitting placement <br /> for ERDI pipe system in accordance with the Plans and these Special Provisions. <br /> Note also whether Earthquake System piping either fully open, fully closed, or midpoint <br /> position in accordance with design of the Earthquake System piping manufacturer. <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-09.2 Materials <br /> Substitute the following for the corresponding material in the material list in 7-09.2: i <br /> Ductile Iron Pipe (non-earthquake resistant) 9-30.1(1) Special Provisions <br /> Polyethylene Encasement 9.30.1(2) Special Provisions <br /> Ductile Iron Pipe (earthquake resistant) 9-30.1(3) Special Provisions111 <br /> Fittings 9-30.2 Special Provisions <br /> Restrained Joints 9-30.2(6) Special Provisions <br /> Bolted, Sleeve—Type Couplings 9-30.2(7) Special Provisions <br /> for Plain End Pipe <br /> Aggregates: <br /> Pipe Zone Backfill 9-03.22 Special Provisions , <br /> Controlled Density Fill 2.09.3(1)E Special Provisions <br /> 7-09.3 Construction Requirements <br /> 7-09.3(5) Grade and Alignment I <br /> Revise the first sentence of the third paragraph in 7-09.3(5) to read as follows: <br /> Water Main Replacement"Q" Division 7—STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—150 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.