Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> sidewalk as long as it appears no structural damage will be done to curb or sidewalk <br /> as a result of the tunneling operations. Regardless of the method used, the Contractor <br /> shall maintain a minimum of 30-inch cover over the service connection line. Where <br /> open cut trench installation is allowed, keep the trench width to 24-inches or less. <br /> At existing metered services noted for removal or replacement on the Plans, salvage <br /> existing meter and stockpile on-site at location approved by City Inspector. Notify City <br /> Inspector 24-hours prior to removal to allow City Inspector to document the meter <br /> number and address of meter being removed. Remove and dispose of existing meter <br /> 1 box, meter setter, fittings and service piping. Where existing metered services are not <br /> being replaced, backfill with native soil, compact and restore the surface to match <br /> existing condition. <br /> ' Abandon in-place existing service connections noted on the Plans by exposing and <br /> closing the corporation stop at the main and plugging the service line near the public <br /> right of way or easement. <br /> ' 7-15.3(1) Relocate Water Meter and Box <br /> (******) <br /> Where shown on the Plans, or as directed by the City Inspector, salvage the existing <br /> ' water meter, meter box and the meter setter being relocated. Reinstall salvaged water <br /> meter, meter box and setter and provide new service connection pipe in accordance <br /> with City of Everett Standard Drawing Nos. 501 and 502 and adjust box to finish grade. <br /> Abandon in-place existing service pipe connection by exposing and closing the <br /> corporation stop at the main and plugging the service line at the old meter box location. <br /> 7-15.4 Measurement <br /> ' Delete first paragraph of 7-15.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> ' Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15.5 Payment <br /> Delete all paragraphs of 7-15.5 and substitute the following: <br /> ' Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 <br /> I <br /> 1 <br /> Water Main Replacement"Q" Division 7—STORM,SEWER,WATER February 9,2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—161 <br />