My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Work also includes abandoning existing service connection and service connection <br /> pipe in-place. <br /> Supplement 7-15.1 as follows: <br /> 7-15.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-15.2 Materials <br /> Delete first paragraph and material list of 7-15.2 and substitute the following: <br /> Provide materials meeting the requirements of the following sections: <br /> Saddles 9-30.6(1) Special Provisions <br /> Corporation Stops 9-30.6(2) Special Provisions <br /> Service Pipe 9-30.6(3) Special Provisions <br /> Service Fittings 9-30.6(4) Special Provisions <br /> Meter Setters 9-30.6(5) Special Provisions <br /> Meter Boxes 9-30.6(7) Special Provisions <br /> Brass Nipples and 9-30.6(8) Special Provisions <br /> Fittings <br /> 7-15.3 Construction Requirements1 <br /> Revise the first paragraph in 7-15.3 to read as follows: <br /> Provide new service connections to new water mains using specified saddles of the <br /> size and type suitable for use with the service pipe being installed. Install new service <br /> connection piping from the main to the meter box as shown on the Plans and directed <br /> by the City Inspector. Install service connection piping perpendicular to the main, <br /> unless shown otherwise on the Plans or directed by the City Inspector. <br /> Revise the second paragraph in 7-15.3 to read as follows: <br /> Provide trench depth adequate to maintain a minimum of 30-inches of cover over the <br /> top of the connecting service pipe. Exercise particular care to ensure that the main is <br /> not damaged by the Work undertaken to install the service. Excavate and backfill for <br /> service connections as specified in Section 7-09; except, use approved boring <br /> methods to install the service pipeline under cement concrete pavement, curbs, and <br /> sidewalks. <br /> Supplement 7-15.3 by adding the following: <br /> Provide service connections to water mains in accordance with COE Standard i <br /> Drawings No. 501 and 502 as applicable. <br /> Field verify actual service connection location, size and material as existing service <br /> information and locations shown on the Plans may not be accurate since this <br /> information is taken from existing records. Match the service size of the existing <br /> service connection with the minimum service size being 3/4-inch. Should the planned <br /> location require moving after verifying actual service connection in field, City Inspector <br /> and the City Utility Department personnel will make final decision as to its relocation. <br /> Replace existing services from the main to the property line, including the meter box <br /> and meter setting if noted on the Plans. <br /> Bore service connection lines, regardless of size, under pavement section, curbs and <br /> sidewalks where soil conditions and other existing buried utilities allow. The City <br /> Inspector will allow open-cut trench installation across pavement section, curbs and <br /> sidewalks only where soil conditions prohibit boring. Open—cut lawn areas and other <br /> non-pavement areas for service installation unless City Inspector directs otherwise. <br /> The City Inspector may, at the Contractor's request, allow tunneling under curb and <br /> Water Main Replacement"Q" Division 7—STORM,SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—160 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.