Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION <br /> ' 8-01 EROSION CONTROL <br /> 8-01.1 Description <br /> Revise the first paragraph in 8-01.1 to read as follows: <br /> This Work consists of furnishing, installing, maintaining, removing and disposing of <br /> high visibility fence, and water pollution and erosion control items in accordance with <br /> ' the Standard Specifications, these Special Provisions, as shown in the Plans, as <br /> shown on COE Standard Drawings, or as designated by the Engineer. <br /> 8-01.3 Construction Requirements <br /> 8-01.3(1) General <br /> Delete the first through eighth paragraphs and substitute the following: <br /> The Contractor shall install a high visibility fence along the site preservation lines <br /> ' shown in the Plans or as instructed by the Engineer. <br /> Throughout the life of the project, the Contractor shall preserve and protect the <br /> delineated area, acting immediately to repair or restore any fencing damaged or <br /> ' removed. <br /> Controlling pollution, erosion, runoff, and related damage requires the Contractor <br /> to perform temporary Work items including but not limited to: <br /> 1. Providing ditches, berms, culverts, and other measures to control surface <br /> water. <br /> 2. Building dams, settling basins, energy dissipaters, and other measures, <br /> ' to control downstream flows. <br /> 3. Controlling underground water found during construction. <br /> 4. Covering or otherwise protecting slopes and stockpiles until permanent <br /> ' erosion-control measures are working. <br /> To the degree possible, the Contractor shall coordinate this temporary Work with <br /> permanent drainage and erosion control Work the Contract requires. <br /> ' All sediment control devices including, but not limited to, sediment ponds, <br /> perimeter silt fencing, or other sediment trapping BMPs shall be installed prior to <br /> any ground disturbing activity. Clearing, grubbing, excavation, borrow, or fill within <br /> ' the Right of Way shall never expose more erodible earth than as listed below: <br /> Western Washington Eastern Washington <br /> (West of the Cascade Mountain (East of the Cascade Mountain <br /> Crest) Crest) <br /> May 1 through <br /> September 30 17 Acres April 1 through <br /> October 31 17 Acres <br /> October 1 through 5 Acres November 1 through 5 Acres <br /> ' April 30 March 31 <br /> 8-01.3(2) Seeding, Fertilizing, and Mulching <br /> 8-01.3(2)A Preparation For Application <br /> Revise the third sentence in the first paragraph in 8-01.3(2)A to read as follows: <br /> Cultivate seeding restoration areas no sooner than one week prior to seeding. <br /> ' Supplement 8-01.3(2)A by adding the following: <br /> All areas to be seeded shall be raked or similarly treated so as to provide a <br /> smooth, consistent, friable surface, acceptable for seeding as determined by <br /> ' tQh"e Engineer. <br /> Water Replacement"Q"'' Division 8—MISC CONSTRUCTION February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—163 <br />