My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION <br /> ' 8-01 EROSION CONTROL <br /> 8-01.1 Description <br /> Revise the first paragraph in 8-01.1 to read as follows: <br /> This Work consists of furnishing, installing, maintaining, removing and disposing of <br /> high visibility fence, and water pollution and erosion control items in accordance with <br /> ' the Standard Specifications, these Special Provisions, as shown in the Plans, as <br /> shown on COE Standard Drawings, or as designated by the Engineer. <br /> 8-01.3 Construction Requirements <br /> 8-01.3(1) General <br /> Delete the first through eighth paragraphs and substitute the following: <br /> The Contractor shall install a high visibility fence along the site preservation lines <br /> ' shown in the Plans or as instructed by the Engineer. <br /> Throughout the life of the project, the Contractor shall preserve and protect the <br /> delineated area, acting immediately to repair or restore any fencing damaged or <br /> ' removed. <br /> Controlling pollution, erosion, runoff, and related damage requires the Contractor <br /> to perform temporary Work items including but not limited to: <br /> 1. Providing ditches, berms, culverts, and other measures to control surface <br /> water. <br /> 2. Building dams, settling basins, energy dissipaters, and other measures, <br /> ' to control downstream flows. <br /> 3. Controlling underground water found during construction. <br /> 4. Covering or otherwise protecting slopes and stockpiles until permanent <br /> ' erosion-control measures are working. <br /> To the degree possible, the Contractor shall coordinate this temporary Work with <br /> permanent drainage and erosion control Work the Contract requires. <br /> ' All sediment control devices including, but not limited to, sediment ponds, <br /> perimeter silt fencing, or other sediment trapping BMPs shall be installed prior to <br /> any ground disturbing activity. Clearing, grubbing, excavation, borrow, or fill within <br /> ' the Right of Way shall never expose more erodible earth than as listed below: <br /> Western Washington Eastern Washington <br /> (West of the Cascade Mountain (East of the Cascade Mountain <br /> Crest) Crest) <br /> May 1 through <br /> September 30 17 Acres April 1 through <br /> October 31 17 Acres <br /> October 1 through 5 Acres November 1 through 5 Acres <br /> ' April 30 March 31 <br /> 8-01.3(2) Seeding, Fertilizing, and Mulching <br /> 8-01.3(2)A Preparation For Application <br /> Revise the third sentence in the first paragraph in 8-01.3(2)A to read as follows: <br /> Cultivate seeding restoration areas no sooner than one week prior to seeding. <br /> ' Supplement 8-01.3(2)A by adding the following: <br /> All areas to be seeded shall be raked or similarly treated so as to provide a <br /> smooth, consistent, friable surface, acceptable for seeding as determined by <br /> ' tQh"e Engineer. <br /> Water Replacement"Q"'' Division 8—MISC CONSTRUCTION February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.