My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 - GENERAL REQUIREMENTS <br /> Supplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> Work being performed includes furnishing all labor, materials and equipment necessary to <br /> remove and replace approximately 2,500 feet 12-in diameter cast iron pipe with new 12-in <br /> diameter earthquake resistant pipe system, and appurtenances, miscellaneous storm <br /> drainage work, and other such appurtenances and performing all Work as required by the <br /> Contract, in accordance with the Contract Plans and Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located on Evergreen Way between <br /> Holly Drive and East Casino Road. <br /> Design Engineer <br /> Questions and inquiries about these Contract Documents should be directed in writing to <br /> the attention of Richard Hefti, PE, City Project Manager, rhefti@everettwa.gov. <br /> Standard Specifications <br /> (******) <br /> All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> Documents. These Specifications are incorporated by reference, made a part of this <br /> Contract and shall control and guide all activities within this Project whether referred to <br /> directly, paragraph by paragraph. <br /> WSDOT/APWA "2016 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter referred to as the <br /> "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the <br /> Standard Specifications and these Special Provisions, all of which are made a part of the <br /> Contract Documents, shall govern all of the Work. The following latest edition of other <br /> specifications and standard plans shall apply to the extent to which they are called out in <br /> these Plans and Special Provisions. <br /> 1 1. City of Everett "Design and Construction Standards and Specifications", latest <br /> edition as found on the Web at "http://everettwa.gov/DocumentCenterNiew/243." <br /> 2. "Standard Plans for Road and Bridge Construction", as prepared by WSDOT. <br /> 3. "Manual on Uniform Traffic Control Devices (MUTCD)." <br /> 4. APWA Standards. <br /> 5. AWWA Standards. <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the <br /> comparable Standard Specification, or is a new Provision. The deletion, amendment, <br /> alteration, or addition to any subsection or portion of the Standard Specifications is meant <br /> to pertain only to that particular portion of the section, and in no way should it be interpreted <br /> that the balance of the section does not apply. <br /> Sections and subsections in the Special Provisions labeled under the headers with (******) <br /> indicate City of Everett Provisions. <br /> Water Main Replacement"Q" Division 1 -GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No-UP3612 SP-37 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.