My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Contract Bond(s): Include a separate performance bond and payment bond, as set <br /> forth in the Contract Documents. (This definition supplements the definition in WSDOT <br /> 1-01.3 for Contract Bond.) <br /> Contract Claim: Any request by the Contractor for additional time or money resulting <br /> in adjustment of Contract Sum or Contract Time irrespective of the cause or reason for <br /> the request. Contract Claims include, but are not limited to, requests by the Contractor <br /> for additional time or money due to Extra Work, inefficiencies, Delays, interferences, <br /> and problems with the design. Contract Claim includes, but is not limited to, claims or <br /> requests by Subcontractors for extensions of Contract Time, adjustment of Contract <br /> Sum, additional compensation that the Contractor attempts to pass through or assert <br /> against the City, or claims against the City arising out of a third party's claim against <br /> the Contractor. <br /> Contract Documents: See definition for "Contract." <br /> Contract Time: The period of time established by the terms and conditions of the <br /> Contract within which the Work must be physically completed. <br /> Contract Execution Date: The date the City of Everett officially binds the Contractor <br /> to the Contract. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br /> Contractor for the Work described in the Contract Documents, as modified by Change <br /> Orders. <br /> 1 Delay: Any increase in the duration of the critical path of the Project. <br /> Dispute: Any controversy or disagreement. <br /> Engineer: The City's representative who administers the construction program for the <br /> City. Provisions in the Contract Documents that state the Engineer"shall" or "will" shall <br /> be deemed to mean that the Engineer shall or will take such action if requested in <br /> writing by the Contractor. (This definition replaces the definition in WSDOT 1-01.3 for <br /> Engineer.) <br /> Equipment: Mechanical, electrical, instrumentation, or other devices with one or more <br /> moving parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic <br /> connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of <br /> Contract Time. <br /> Extra Work: Providing materials and Equipment and the performance of Work not <br /> directly called for in, or implied by, the Contract Documents, such that Contractor <br /> would be entitled to an adjustment of Contract Sum and possibly an extension of <br /> Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the <br /> Contractor's Work has been completed, except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date, or the <br /> early finish date and the late finish date of an activity in the Project schedule. <br /> Force Account: Costs of performing Work as defined in 1-09.6 FORCE ACCOUNT. <br /> Furnish: To deliver items, Equipment, or material to the job site or other specified <br /> location. <br /> Install: Placing, erecting, or constructing complete in place items, Equipment, or <br /> material. <br /> May: Conduct that is permitted, but not required. <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—39 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.