My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> one of the general partners must be shown; if made by a corporation, the Proposal <br /> shall show the name of the state under the laws of which the corporation is chartered, <br /> the name and post office address of the corporation, and the title of the person who <br /> signs on behalf of the corporation. If the Proposal is made by a joint venture, the <br /> ' Proposal shall be signed by a representative of one of the joint venture firms. <br /> Additionally, the Proposal shall include a copy of the resolution or agreement <br /> empowering the representative to execute the Proposal and bind the joint venture. <br /> Supplement 1-02.6 by adding the following: <br /> ' In the event that the product of a unit price and an estimated quantity does not equal <br /> the extended amount quoted, the unit price shall govern, and the correct product of the <br /> unit price and the estimated quantity shall be deemed to be the amount bid. If the sum <br /> of two or more items in a bidding schedule does not equal the total amounts quoted, <br /> the individual item amounts shall govern and the correct total shall be deemed to be <br /> the amount bid. Do not qualify Proposal, since this will automatically be cause for <br /> rejection of the Proposal. <br /> Bidders are warned against making erasures or alterations of any kind to the Proposal <br /> Form, and proposals that contain omissions, erasures, or irregularities of any kind may <br /> be rejected. No oral, electronic, fax, telegraphic, or telephonic proposals or <br /> modifications will be considered. <br /> 1-02.7 Bid Deposit <br /> ' Supplement 1-02.7 by adding the following: <br /> Bid deposit shall serve as evidence of good faith and as a guarantee that if awarded <br /> the Contract the Bidder will execute the Contract and provide bonds as required by the <br /> Bid. Should the successful Bidder fail to enter into the Contract, furnish a satisfactory <br /> performance and payment bond, and furnish evidence of insurance within 14 calendar <br /> days after the Award Date, the certified check, cashier's check or bid bond shall be <br /> forfeited as liquidated damages. <br /> Bid bonds shall contain the following: <br /> 1. City-assigned number for the Project; <br /> 2. Name of the Project; <br /> 3. The City of Everett named as obligee; <br /> 4. The amount of the bid bond stated either as a dollar figure or as a percentage <br /> that represents five percent of the maximum bid amount that could be <br /> awarded; <br /> 5. Signature of the Bidder's officer empowered to sign official statements. The <br /> signature of the person authorized to submit the Bid should agree with the <br /> signature on the bond, and the title of the person must accompany the said <br /> signature; <br /> 111 6. The signature of the surety's officer empowered to sign the bond and the <br /> power of attorney. <br /> Bidder shall use the bond form included in the Bid Documents. <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification <br /> 1-02.8(1) Noncollusion Declaration <br /> Delete the last paragraph of 1-02.8(1) and supplement by adding the following: <br /> The City has determined every Bidder must submit a Non-Collusion Affidavit for <br /> every Project. Accordingly, the Bidder shall submit a "Non-Collusion Affidavit", <br /> ' Water Main Replacement"Q" Division 1 -GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No-UP3612 SP-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.