My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work, whether lump sum, Force Account, or unit price; <br /> 3. Acceptability of rates of progress on the Work; <br /> 4. Interpretation of Plans and Specifications; <br /> ' 5. Determination as to the existence of changed or differing site conditions; <br /> 6. Fulfillment of the Contract by the Contractor; <br /> 7. Payments under the Contract including adjustment; <br /> 8. Suspension(s) of Work; <br /> 9. Termination of the Contract for default or public convenience; and <br /> 10. Approval of working or detail Plans and Submittals. <br /> If the Contractor fails to respond promptly to the requirements of the Contract or orders <br /> from the City's Representative: <br /> 1. The City's Representative may use the City's resources, other contractors, or other <br /> means to accomplish the Work, and <br /> 2. The City will not be obligated to pay the Contractor, and will deduct from the <br /> Contractor's payments, costs that result when other means are used to carry out <br /> the Contract requirements or City's Representative's orders. <br /> At the Contractor's risk, the City's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms, to carry out the City's Representative's <br /> orders, or to correct unsafe conditions of any nature; or <br /> 2. It is in the public interest. <br /> The City's Representative and City shall have complete access to the Work and to the site <br /> of the Work and to the places where Work is being prepared or where materials, <br /> Equipment, and machinery are being obtained for the Work. If requested by the City's <br /> Representative or City, the Contractor shall provide the assistance necessary for obtaining <br /> such access, and shall provide information related to the inspection of construction. <br /> Absence of such access or information, as needed, may result in the City's refusal to <br /> accept the Work. <br /> The City's Representative has the authority to recommend Change Orders, but does not <br /> have authority to approve Change Orders. Proposed Change Orders are subject to review <br /> and approval by the City. No proposed Change Order or any change of Contract Sum or <br /> Contract Time is effective or binding upon the City unless and until the Mayor or its <br /> designee signs it, as authorized by City Council or by ordinance. <br /> To detail and illustrate the Work, the City's Representative may furnish to the Contractor <br /> additional drawings and explanations consistent with the original Plans. The Contractor <br /> shall perform the Work according to these additional drawings and explanations. <br /> The City's Representative may appoint assistants and inspectors to assist in determining <br /> that the Work and materials meet the Contract requirements. Assistants and inspectors <br /> have the authority to reject defective material and suspend Work that is being done <br /> improperly, subject to the final decisions of the City's Representative or, when appropriate, <br /> the City. <br /> Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material <br /> furnished that does not meet the Contract requirements shall be at the Contractor's risk and <br /> shall not be a basis for a Contract Claim even if the inspectors or assistants purport to <br /> change the Contract. <br /> ' Water Main Replacement"Q" Division 1 -GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No-UP3612 SP-57 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.