SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The City's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The City will not be obligated to <br /> accept or pay for Work performed by the Contractor that may be affected by materials, <br /> Equipment, or methods of work not submitted in a timely manner so that final review <br /> can be accomplished before the affected Work is complete. The City shall not be <br /> responsible for Delays, inefficiencies, or any additional costs or expenses caused in <br /> whole or in part by Contractor's failure to submit required information in sufficient time <br /> for review, comment, and correction. Contractor's failure to submit required <br /> information in sufficient time for review, comment and correction shall be deemed a <br /> waiver of any and all Contract Claims for adjustment of Contract Sum or Contract Time <br /> arising out of, or related to, such a Submittal. Contractor acknowledges and agrees <br /> that it may not rely upon receiving the City's response to a Submittal in less than 14 <br /> calendar days, unless the City explicitly changes this section by a signed Change <br /> Order. <br /> 1-05.3(2) Requests for Information I <br /> (******) <br /> Requests for information or clarification from the Contractor to the City shall be treated <br /> as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br /> 1-05A Conformity With and Deviations From Plans and Stakes <br /> Delete all of 1-05.4 and substitute the following: <br /> The Contractor shall be responsible for setting and maintaining all alignment stakes, <br /> slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br /> paving, channelization, illumination, signing, bridges, and retaining walls, if such <br /> construction is included in this Project. Except for the survey control data to be <br /> furnished by the City, calculations, surveying, and measuring required for setting and <br /> maintaining the necessary lines and grades shall be the Contractor's responsibility. <br /> The Contractor shall provide the City with copies of such calculations and staking data <br /> when requested by the Engineer. Copies of the City provided survey control data are <br /> available for the Bidder's inspection at the office of the Project Engineer. <br /> Any staking requirements for the Project that do not fit field conditions will be reviewed <br /> and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br /> information will be provided to the Contractor for use in completing the Work. <br /> Stakes, marks, and other reference points, including existing monumentation, set by <br /> the City shall be carefully preserved by the Contractor. The Contractor will be charged <br /> for the costs of replacing stakes, markers and monumentation that were not to be <br /> disturbed but were destroyed or damaged by the Contractor's operations. This charge <br /> will be deducted from monies due or to become due to the Contractor. <br /> To facilitate the establishment of these lines and elevations, the City will provide the <br /> Contractor with the following survey control: <br /> ROADWAY, SURFACING AND PAVING <br /> Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—60 <br /> I <br />