Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> items. Type 2 and 2E Working Drawings may include, and not be limited to, Catalog <br /> ' cuts or standard plans for commonly used manufactured items. <br /> The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> Working Drawings, and for complete conformity with the Contract Documents, even if <br /> ' the Working Drawings have been approved by the Engineer, or if the Contractor and <br /> the Engineer agree on dimensions and details. The City does not accept Working <br /> Drawings as accurate or adequate, and does not take responsibility for, or warrant that <br /> Working Drawings will meet Contract requirements. <br /> Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br /> for variation from the requirements of the Contract Documents unless Contractor has <br /> in writing called the Engineer's attention to each such variation at the time of <br /> submission, and the Engineer has given written approval of each such variation by a <br /> specific written notation thereof incorporated in or accompanying the returned Working <br /> Drawing; nor will review by Engineer relieve Contractor from responsibility for errors or <br /> omissions in the Working Drawings or from responsibility for having complied with the <br /> provisions of this section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require Working Drawings that may or may not be applicable to this specific project. <br /> This list is supplied as an aid to the Contractor and is by no means complete. <br /> Submittal requirements may be found in 1-05.3(1) or elsewhere in these Special <br /> Provisions. <br /> DIVISION 2 EARTHWORK <br /> 2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-09 Water Mains <br /> 7-09.2 Materials-Catalog Cuts or Standard Plans <br /> 7-12 Valves For Water Mains <br /> 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 7-14 Hydrants <br /> 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 7-15 Service Connections <br /> 7-15.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 8-13 Monument Cases <br /> 8-13.2 Materials-Standard Plans <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by <br /> the Specifications, related Work performed prior to completion of the Engineer's review <br /> of the pertinent submission will be the sole expense and responsibility of the <br /> Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> I <br /> ' Water Main Replacement"Q" Division 1 —GENERAL REQUIREMENTS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No—UP3612 SP—59 <br /> I <br />