Laserfiche WebLink
1 1 <br /> 2 a. Persistent conduct that is offensive and unwelcome. <br /> I 3 <br /> 4 b. Conduct that is considered to be hazing. <br /> 5 <br /> I 6 c. Jokes about race, gender, or sexuality that are offensive. <br /> 7 <br /> 8 d. Unwelcome, unwanted, rude or offensive conduct or advances of a sexual <br /> I 9 nature which interferes with a person's ability to perform their job or creates an <br /> 10 intimidating, hostile, or offensive work environment. <br /> 11 <br /> I 12 e. Language or conduct that is offensive, threatening, intimidating or hostile <br /> 13 based on race, gender, or sexual orientation. <br /> 14 <br /> f. Repeating rumors about individuals in the Work Site that are considered to be <br /> I15 <br /> 16 harassing or harmful to the individual's reputation. <br /> 17 <br /> 18 1-07.11(5) Sanctions <br /> 1 19 This section is supplemented with the following: <br /> 20 <br /> 21 Immediately upon the Engineer's request, the Contractor shall remove from the Work <br /> I 22 site any employee engaging in behaviors that promote harassment, humiliation, fear or <br /> 23 intimidation including but not limited to those described in these specifications. <br /> 24 <br /> I 25 1-07.11(6) Incorporation of Provisions <br /> 26 The first sentence is revised to read: <br /> 27 <br /> I 28 The Contractor shall include the provisions of Section 1-07.11(2) Contractual <br /> 29 Requirements (1) through (5) and the Section 1-07.11(5) Sanctions in every subcontract <br /> 30 including procurement of materials and leases of equipment. <br /> I 31 <br /> 32 1-07.18 Public Liability and Property Damage Insurance <br /> 33 Item number 1 is supplemented with the following new sentence: <br /> I 34 <br /> 35 This policy shall be kept in force from the execution date of the Contract until the <br /> 36 Physical Completion Date. <br /> 37 <br /> 1 38 1-08.AP1 <br /> 39 Section 1-08, Prosecution and Progress <br /> 40 January 2, 2018 <br /> I41 1-08.5 Time for Completion <br /> 42 Item number 2 of the sixth paragraph is supplemented with the following: <br /> I 43 <br /> 44 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 45 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> I 46 Notice of Termination by Ecology; and no rejection of the Notice of Termination by <br /> 47 Ecology. This requirement will not apply if the Construction Stormwater General <br /> 48 Permit is transferred back to the Contracting Agency in accordance with Section 8- <br /> I <br /> 49 01.3(16). <br /> 50 <br /> 51 1-08.7 Maintenance During Suspension <br /> I52 The fifth paragraph is revised to read: <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 5 OF 53 March 6,2018 <br /> I WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />