My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1 shall be immediatelycovered with drypavingsand before the asphalt cement <br /> p <br /> 2 solidifies. <br /> I 3 <br /> 4 The inside throat of the structure shall be thoroughly mortared and plastered <br /> 5 through to the outside of the structure's concrete adjustment rings. <br /> I 6 <br /> 7 Castings that need replacement shall be identified by the City of Everett. <br /> 8 Replacement casting will be supplied by the City of Everett and original casting will <br /> 111 <br /> 9 be picked up by the City of Everett. <br /> 10 <br /> 11 <br /> I 12 GLF 7-05.3(5).DOCX <br /> 13 Adjusting Valve Boxes to Grade <br /> 14 (******) <br /> I 15 <br /> 16 Section 7-05.3 of the standard specifications is supplemented with the following: <br /> I17 <br /> 18 (******) <br /> I 19 <br /> 20 Where shown in the plans, existing valve boxes and covers shall be adjusted to the <br /> grade as staked or otherwise designated by the Engineer. The adjustment of the <br /> 21 valve box to grade by the use of riser rings is not allowed. <br /> 22 <br /> I23 Removal operations shall be conducted to prevent damage to the valve boxes. Any <br /> 24 parts or materials damaged due to the Contractor's operations shall be replaced at <br /> 25 his expense. <br /> t 26 <br /> 27 The Contractor shall conduct his valve box adjustments so that the fully-adjusted <br /> 28 box allows the respective valve to be fully operational. The Contractor shall <br /> I 29 remove all debris from the adjusted valve boxes to ensure such operational <br /> 30 condition. <br /> n4 <br /> JI <br /> I 32 <br /> 33 GLF 7-05.4.DOCX <br /> 34 7-05.4 Measurement <br /> I 35 <br /> 36 Section 7-05.4 of the standard specifications is deleted and replaced with the following: <br /> 37 <br /> 1 38 (******) <br /> 39 "Adjust Manhole to Grade", shall be measured per each. <br /> I 40 <br /> 41 "Adjust Catch Basin/Inlet to Grade", shall be measured per each. <br /> 42 <br /> 43 "Adjust Valve Box to Grade", shall be measured per each. <br /> I44 <br /> 45 <br /> 46 GLF 7-05.5.DOCX <br /> I 47 7-05.5 Payment <br /> 48 <br /> 49 Section 7-05.5 of the standard specifications is deleted and replaced with the following: <br /> 1 50 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 43 OF 57 March 6,2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.