My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 (******) <br /> 2 Payment will be made for each of the following bid items that are included in the <br /> 3 proposal: <br /> 4 <br /> 5 "Adjust Manhole to Grade", per each. <br /> 6 <br /> 7 "Adjust Catch Basin/Inlet to Grade", per each. <br /> 8 <br /> 9 "Adjust Valve Box to Grade", per each. <br /> 10 <br /> 11 The payment for "Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall <br /> 12 be full compensation for all costs necessary to make the adjustment including <br /> 13 temporary cover to adjust existing structure to required elevation, construction of <br /> 14 asphalt transition around the structure, and restoration on adjacent area. Adjustment of <br /> 15 any structures twice will be paid as one adjustment. <br /> 16 <br /> 17 END DIVISION7.RTF <br /> 18 <br /> 19 END DIVISION 7 <br /> 20 i <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 44 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.