Laserfiche WebLink
1 <br /> 1 (******) <br /> 2 Payment will be made for each of the following bid items that are included in the <br /> 3 proposal: <br /> 4 <br /> 5 "Adjust Manhole to Grade", per each. <br /> 6 <br /> 7 "Adjust Catch Basin/Inlet to Grade", per each. <br /> 8 <br /> 9 "Adjust Valve Box to Grade", per each. <br /> 10 <br /> 11 The payment for "Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall <br /> 12 be full compensation for all costs necessary to make the adjustment including <br /> 13 temporary cover to adjust existing structure to required elevation, construction of <br /> 14 asphalt transition around the structure, and restoration on adjacent area. Adjustment of <br /> 15 any structures twice will be paid as one adjustment. <br /> 16 <br /> 17 END DIVISION7.RTF <br /> 18 <br /> 19 END DIVISION 7 <br /> 20 i <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 44 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />