Laserfiche WebLink
I <br /> 1 perform the field tests specified in Section 8 20.3(14)D. The test results <br /> 2 shall be recorded and submitted to the Engineer. Loops that fail any of <br /> 3 these tests shall be replaced. <br /> 4 <br /> 5 Loops that fail the tests, as described above, and are replaced shall be <br /> 6 installed in accordance with current City of Everett design standards and <br /> 7 Standard Drawings, as determined by the Engineer. <br /> 89 If traffic signal loops that fail the tests, as described above, are not <br /> 10 replaced and operational within 48 hours, the Contractor shall install and <br /> 11 maintain interim video detection until the replacement loops are <br /> 12 operational. The type of interim video detection furnished shall be <br /> 111 <br /> 13 approved by the Engineer prior to installation. <br /> 14 <br /> 15 GLF 8-20.4.DOCX <br /> 16 8-20.4 Measurement <br /> 17 <br /> 18 Section 8-20.4 is supplemented with the following: <br /> 19 <br /> 20 (******) <br /> 21 "Vehicle Loop Detectors", for both loop perimeter and home run, shall be measured by <br /> 22 the linear foot of the neat sawcut line in place in the roadway. No additional <br /> 23 measurement will be made for the installation of loop wire in lead-in conduit and shall be <br /> 24 included in the measurement for Vehicle Loop Detectors. <br /> 25 <br /> 26 "Loop Detector Lead-In Cable" shall be measured by the linear foot of the neat line of <br /> 27 conduit between the controller cabinet and loop splice. No additional measurement will <br /> 28 be made for coiled loop detector cable in junction boxes or cabinets. <br /> 29 <br /> 30 "Conduit Pipe 2 In. Diam." shall be measured by the linear foot of the neat line of11 <br /> 31 conduit between the junction box and the face of curb or face of gutter. No additional <br /> 32 measurement will be made for sweeps or elbows in junction boxes or at the curb line. <br /> 33 <br /> 34 "Replace Junction Box" shall be measured per each. <br /> 35 <br /> 36 <br /> 37 GLF 8-20.5.DOCX <br /> 38 8-20.5 Payment <br /> 39 <br /> 40 Section 8-20.5 is supplemented with the following: <br /> 41 <br /> 42 (******) I <br /> 43 "Vehicle Loop Detectors," per linear foot. <br /> 44 <br /> 45 The unit contract price shall include saw cutting, cleaning and drying of pavement, <br /> 46 installing loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and <br /> 47 splicing between loop wire and lead-in cable, and any work necessary to access a <br /> 48 junction box and testing of the vehicle detectors as defined in Section 8-20.3(14)D. <br /> 49 <br /> 50 No payment shall be made for any loops that are not spliced and fully operational, <br /> 51 including any loop detector lead-in cable required to make the loop operational. I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 50 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />