My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 Bridge and Structure Removal <br /> 3 <br /> 4 2-03.AP2 <br /> 5 Section 2-03, Roadway Excavation and Embankment <br /> 6 August 1, 2016 <br /> 7 2-03.3(7)C Contractor-Provided Disposal Site <br /> 8 The second paragraph is revised to read: <br /> 9 <br /> 10 The Contractor shall acquire all permits and approvals required for the use of the <br /> 11 disposal sites before any waste is hauled off the project. The Contractor shall submit a <br /> 12 Type 1 Working Drawing consisting of copies of the permits and approvals for any <br /> 13 disposal sites to be used. The cost of any such permits and approvals shall be included <br /> 14 in the Bid prices for other Work. <br /> 15 <br /> 16 The third paragraph is deleted. <br /> 17 <br /> 18 2-06.AP2 <br /> 19 Section 2-06, Subgrade Preparation <br /> 20 January 3, 2017 <br /> 21 2-06.3(2) Subgrade for Pavement <br /> 22 The second sentence in the first paragraph is revised to read: <br /> 23 <br /> 24 The Contractor shall compact the Subgrade to a depth of 6 inches to 95 percent of <br /> 25 maximum density as determined by the compaction control tests for granular materials. <br /> 1 26 <br /> 27 3-04.AP3 <br /> 28 Section 3-04, Acceptance of Aggregate <br /> 29 January 3, 2017 <br /> 30 3-04.5 Payment <br /> 31 In Table 1, the Contingent Unit Price Per Ton value for the item HMA Aggregate is revised <br /> 32 to read "$15.00". <br /> 33 <br /> 34 4-04.AP4 <br /> 35 Section 4-04, Ballast and Crush Surfacing <br /> 36 January 3, 2017 <br /> 37 4-04.3(5) Shaping and Compaction <br /> 38 The first sentence is revised to read: <br /> 49 <br /> 40 Immediately following spreading and final shaping, each layer of surfacing shall be <br /> 41 compacted to at least 95 percent of maximum density determined by the requirements <br /> 42 of Section 2-03.3(14)D before the next succeeding layer of surfacing or pavement is <br /> 43 placed. <br /> 44 <br /> 45 5-01.AP5 <br /> 46 Section 5-01, Cement Concrete Pavement Rehabilitation <br /> 47 January 3, 2017 <br /> 48 In this section, "portland cement" is revised to read "cement". <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 7 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.