My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) ) <br /> NOTES <br /> 1. REFERENCES SEE STANDARD DRAWING 722 <br /> TYPE 2W <br /> (WHITE,ONE SIDE,ARTERIAL STREETS ONLY) 2. MATERIAL THICKNESS SHALL BE MIN.25 MILS, <br /> CONSISTING OFTWO <br /> COATSPAINTT EQUIVALENT <br /> MA). <br /> I I HOT TAPE OR METHYL METHACRYLATE(MMA). <br /> N In= V <br /> 10' 10' <br /> STRIPE 30'GAP STRIPE <br /> 40' <br /> LANE WIDTH <br /> MEASUREMENT POINT <br /> LANE LINE (WHITE) <br /> TYPE 2YY VEHICLE LANE WIDTH <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) / MEASUREMENT ID HT WHEN <br /> /// USED AS BICYCLE STRIPE `N <br /> I— <br /> '4 �I I <br /> I 1 N 11.111.1111M— t <br /> --• 10' 10' LANE WIDTH MEASUREMENT <br /> STRIPE <br /> U <br /> PE 30'GAP STRIPE POINT WHEN USEEAS GORE AS GORE OR <br /> qp EDGE LINE <br /> LANE WIDTH <br /> MEASUREMENT POINT GORE,XQI8"21 EDGE,WI34"®BICYCLE,WIB 8" <br /> TWO WAY LEFT TURN LANE LINE (YELLOW) WIDE, EDGE AND BICYCLE LINE (WHITE) <br /> TYPE 2YY <br /> (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) <br /> I I - <br /> ^ �� v <br /> i .... <br /> 10' 10' <br /> STRIPE 30'GAP STRIPE <br /> TYPE 2YY 40' _ <br /> ! (YELLOW,BOTH SIDES,ARTERIAL STREETS ONLY) SKIP CENTER LINE (YELLOW) <br /> 0 <br /> LANE WIDTH <br /> MEASUREMENT POINT <br /> "1,iV — <br /> Ill I — 4 <br /> CITY OF EVERETT <br /> oz„ L'" 40' LANE WIDTH 'AVEErr PUBLIC WORKS DEPARTMENT <br /> oMEASUREMENT POINT ^" <br /> DOUBLE YELLOW CENTER LINE <br /> o� �ft'RYAN$A$$ !COREY HERT I'PAULWILNELM Ip7SH <br /> m„ 12/30/2016 <br /> a;.56 <br /> .8r ROADWAY STRIPING DETAILS 720 <br />
The URL can be used to link to this page
Your browser does not support the video tag.