My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I— <br /> 6' Al A Q GENERAL NOTES FOR LOOP INSTALLATION: <br /> 1' MIN 1. INSTALL JUNCTION BOX AND LEAD-IN CONDUIT. <br /> A z 2. SAW LOOP SLOTS AND LEAD-IN SLOTS. <br /> o.R 6'0 Z <br /> A v © 3. LAY OUT LOOP WIRE BEGINNING AT JUNCTION BOX,ALLOWING 5'MINIMUM <br /> O SLACK. <br /> N <br /> VOA O 4. INSTALL WIRE IN LOOP SLOT.SEE LOOP WINDING DETAIL. <br /> m 5. RETURN TO JUNCTION BOX AND IDENTIFY LEADS WITH PLAN DETECTOR NUMBER <br /> B B B B 0 AND"5"FOR START AND"F"FOR FINISH. <br /> 6. TWIST EACH PAIR OF LEAD-IN WIRES TWO TURNS PER FOOT FROM LOOP TO <br /> JUNCTION BOX AND INSTALL IN LEAD-IN SLOT AND CONDUIT.REVERSE DIRECTION <br /> SECTION A-A OF TWIST FOR EACH SUCCESSIVE PAIR INSTALLED. <br /> 0 7. CONSTRUCT SUPPLEMENTAL SPLICE CONTAINING ANY SERIES OR PARALLEL LOOP <br /> ■ CONNECTIONS REQUIRED IN PLANS.SUPPLEMENTAL SPLICES ARE SUBJECT TO THE <br /> ■■ x SAME REQUIREMENTS SHOWN FOR THE LOOP LEAD AND SHIELDED CABLE SPLICE. <br /> IF APPROVED BY ENGINEER SCOTCHLOK 3570 EPDXY KIT SEALING PACKS MAY BE <br /> 4 TURNS N 2 SUBSTITUTED FOR THE SCOTCHCAST 82-B1 FOR SUPPLEMENTAL SPLICES. <br /> 111 <br /> iiiii 00 Z 8. SPLICE LOOP LEADS OR SUPPLEMENTAL SPLICE LEADS TO SHIELDED CABLE AS <br /> \\ // NOTED. <br /> © _� <br /> O N § 9. COMPLETE INSTALLATION AND TEST LOOP CIRCUITS OR COMBINATION LOOP <br /> 00 a CIRCUITS.SEE WSDOT STANDARD SPEC 8-20.3(14)D. <br /> TYPE 2 <br /> A. <br /> TYPE 3 `\ m 10. FOR LOOP LOCATION REFER TO STANDARD DRAWING 805 AND PLANS. <br /> 11. SEAL ENDS OF CONDUIT WITH ELECTRICAL PUTTY OF SILICONE. <br /> SECTION B-B 12. DRILL HOLE FOR HOME-RUN CONDUIT 1"LARGER THAN CONDUIT AND FILL VOID <br /> WITH HOT MIX ASPHALT. <br /> h 30' 13. ALL SPLICES SHALL BE ABLE TO BE RAISED A MINIMUM OF 16"ABOVE GROUND <br /> II <br /> Al /—SAWCUT(TYP) LINE. <br /> o A O 14. BUCHANAN 20065 SPLICE CAPS,CRIMP WITH BUCHANAN C-24 CRIMPER <br /> 00 CO FOLLOWING MANUFACTURE'S INSTALLATION PROCEDURE.SOLDER CRIMP(NO <br /> O N "MIN OPEN FLAME TORCH OR SIMILAR IS ALLOWED)AND TAPE WITH 2 LAYERS OF TAPE. <br /> to`� A <br /> A W <br /> ® INSTALLATION NOTES: <br /> 0 <br /> c I L'' 1. SEALANT-CRAFCO PART NO 34271,OR APPROVED EQUAL. <br /> c <br /> B B A Nz z DETAIL B 2. LOOP WIRE-NUMBER VARIES SEE LOOP WINDING DETAILS STANDARD DRAWING 810. <br /> N <br /> ` 3. LEAD-IN WIRES:ONE PAIR FOR EACH LOOP SERVED,3 PAIR MAX PER SAWCUT. <br /> 0 0 4. EXTEND SAWCUT SUFFICIENT LENGTH TO PROVIDE FULL SAWCUT DEPTH AROUND <br /> o <br /> CORNERS. <br /> 411 <br /> r I 5. LOCATE CORNER SAWCUT AT 45'TO SIDE CUTS TO PREVENT KINK IN LOOP WIRE AND <br /> :4. <br /> 3 TURNS IIIALSO MINIMIZE VOID.TRIANGULAR VOID WILL BE REMOVED AND FILLED WITH <br /> A - SAWCUT TO IB SEALANT. <br /> � <br /> ; �, BICYCLE STOP LINE DETAIL C CITY OF EVERETT <br /> TYPE 1 y YET PUBLIC WORKS DEPARTMENT <br /> ate RYAN SASS ICORY HEAT I PAULVL WILHELM I ESH 04/07/2017 <br /> se LOOP WINDING "� ,.�.o� <br /> £s£ TRAFFIC INDUCTION LOOP <br /> ` LOOP TYPES, SAW CUT SECTIONS&NOTES 810 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.