1 1 <br /> 2 Al! areas of the deck that are inaccessible to the selected scarifying machine shall be <br /> 1 3 scarified to remove the concrete surface matrix to a maximum nominal scarification <br /> 4 depth shown in the Plans by a method acceptable to the Engineer. <br /> 5 <br /> I 6 This section is supplemented with the following: <br /> 7 <br /> 8 Concrete process water generated by scarifying concrete surface and removing existing <br /> I 9 <br /> 10 concrete overlay operations shall be contained, collected, and disposed of in <br /> accordance with Section 5-01.3(11) and Section 6-09.3(5)C, and the Section 6-09.3(2) <br /> 11 Runoff Water Disposal Plan. <br /> I 12 <br /> 13 6-09.3(5)B Testing of Hydro-Demolition and Shot Blasting Machines <br /> 14 This section's title is revised to read: <br /> I 15 <br /> 16 Testing of Hydro-Demolition Machines <br /> 17 <br /> 18 The second paragraph is revised to read: <br /> I 19 <br /> 20 In the "sound" area of concrete, the equipment shall be programmed to remove <br /> 21 concrete to the nominal scarification depth shown in the Plans with a single pass of the <br /> I 22 machine. <br /> 23 <br /> 24 6-09.3(5)D Shot Blasting <br /> I 25 This section, including title, is revised to read: <br /> 26 <br /> 27 6-09.3(5)D Vacant <br /> 1 28 <br /> 29 6-09.3(5)E Rotomilling <br /> 30 This section, including title, is revised to read: <br /> I 31 <br /> 32 6-09.3(5)E Removing Existing Concrete Overlay Layer by Rotomilling <br /> 33 When the Contractor elects to remove the upper layer of existing concrete overlay, <br /> I 34 when present, by rotomilling prior to final scarifying, the entire concrete surface of the <br /> 35 bridge deck shall be milled to remove the surface matrix to the depth specified in the <br /> 36 Plans with a tolerance as specified in Section 6-08.3(5)B. The operating parameters of <br /> I 37 the rotary milling machine shall be monitored in order to prevent the unnecessary <br /> 38 removal of concrete below the specified removal depth. <br /> 39 <br /> 40 6-09.3(6) Further Deck Preparation <br /> I41 The first paragraph is revised to read:: <br /> 42 <br /> 43 Once the lane or strip being overlaid has been cleaned of debris from scarifying, the <br /> 1 44 Contractor, with the Engineer, shall perform a visual inspection of the scarified surface. <br /> 45 The Contractor shall mark those areas of the existing bridge deck that are authorized by <br /> 46 the Engineer for further deck preparation by the Contractor. <br /> I 47 <br /> 48 Item number 4 of the second paragraph is deleted. <br /> 49 <br /> I 50 The first sentence of the third paragraph is deleted. <br /> 51 <br /> 52 6-09.3(6)A Equipment for Further Deck Preparation <br /> I53 This section is revised to read: <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 19 OF 53 • <br /> March 6,2018 <br /> I WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />