My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Aggregate re ate for bituminous surface treatment shall be manufactured from ledge rock, <br /> 2 talus, or gravel, in accordance with Section 3-01. Aggregates for Bituminous Surface <br /> ' 3 Treatment shall meet the following test requirements: <br /> 4 <br /> 5 9-03.8(1) General Requirements <br /> 6 The first paragraph (up until the colon) is revised to read: <br /> 7 <br /> 8 Aggregates for Hot Mix Asphalt shall meet the following test requirements: <br /> 9 <br /> 10 9-03.8(7) HMA Tolerances and Adjustments <br /> 11 In the table in item number 1, the fifth row is revised to read: <br /> ' 12 <br /> Asphalt binder • -0.4% to 0.5% ±0.7% <br /> 13 <br /> ' 14 In the table in item number 1, the following new row is inserted before the last row: <br /> 15 <br /> Voids in Mineral -1.5% <br /> I Ag•regate, VMA <br /> 16 <br /> 17 9-03.9(1) Ballast <br /> ' 18 The second paragraph (up until the colon) is revised to read: <br /> 19 <br /> 20 Aggregates for ballast shall meet the following test requirements: <br /> ' 21 <br /> 22 9-04.AP9 <br /> 23 Section 9-04, Joint and Crack Sealing Materials <br /> 24 January 2, 2018 <br /> ' 25 9-04A(2) Premolded Joint Filler for Expansion Joints <br /> 26 In this section, each reference to "AASHTO T 42" is revised to read "ASTM D 545". <br /> 27 <br /> 28 9-04.2(1)A1 Hot Poured Sealant for Cement Concrete Pavement <br /> 29 This section is supplemented with the following: <br /> I 30 <br /> 31 Hot poured sealant for cement concrete pavement is acceptable for installations in joints <br /> 32 where cement concrete pavement abuts a bituminous pavement. <br /> 33 <br /> 34 9-04.2(1)A2 Hot Poured Sealant for Bituminous Pavement <br /> 35 This section is supplemented with the following: <br /> ' 36 <br /> 37 Hot poured sealant for bituminous pavement is acceptable for installations in joints <br /> 38 where cement concrete pavement abuts a bituminous pavement. <br /> 49 <br /> 40 9-06.AP9 <br /> 41 Section 9-06, Structural Steel and Related Materials <br /> 42 January 2, 2018 <br /> 43 9-06.5 Bolts <br /> 44 This section's title is revised to read: <br /> 45 <br /> 46 Bolts and Rods <br /> 47 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 41 OF 53 March 6,2018 <br /> ' WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.