My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> ' 2 <br /> 3 COE INTRO-2016.RTF <br /> 4 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 5 (August 14, 2013 APWA GSP) <br /> 6 <br /> 7 The work on this project shall be accomplished in accordance with the Standard <br /> 8 Specifications for Road, Bridge and Municipal Construction, 2016 edition, as issued by the <br /> 9 Washington State Department of Transportation (WSDOT) and the American Public Works <br /> 10 Association (APWA), Washington State Chapter (hereafter "Standard Specifications"). The <br /> 11 Standard Specifications, as modified or supplemented by the Amendments to the Standard <br /> 12 Specifications and these Special Provisions, all of which are made a part of the Contract <br /> 13 Documents, shall govern all of the Work. <br /> 14 <br /> 15 These Special Provisions are made up of both General Special Provisions (GSPs) from <br /> 16 various sources, which may have project-specific fill-ins; and project-specific Special <br /> ' 17 Provisions. Each Provision either supplements, modifies, or replaces the comparable <br /> 18 Standard Specification, or is a new Provision. The deletion, amendment, alteration, or <br /> 19 addition to any subsection or portion of the Standard Specifications is meant to pertain only <br /> I <br /> 20 to that particular portion of the section, and in no way should it be interpreted that the <br /> 21 balance of the section does not apply. <br /> 22 <br /> 23 The project-specific Special Provisions are not labeled as such. The GSPs are labeled <br /> 24 under the headers of each GSP, with the effective date of the GSP and its source. For <br /> 25 example: <br /> 26 <br /> 27 (March 8, 2013 APWA GSP) <br /> 28 (April 1, 2013 WSDOT GSP) <br /> 29 <br /> ' 30 Also incorporated into the Contract Documents by reference are: <br /> 31 Manual on Uniform Traffic Control Devices for Streets and Highways, currently <br /> 32 adopted edition, with Washington State mod'fications, if any <br /> ' 33 C_ Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, <br /> 34 current edition <br /> 35 ❑ City of Everett Design and Construction Standards and Specifications for <br /> 36 Development <br /> 37 <br /> 38 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> I <br /> I <br /> I <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 1 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.