Laserfiche WebLink
1 <br /> 2 <br /> 3 DIVISION1.GR1 <br /> 4 Division 1 <br /> 5 General Requirements <br /> 61 <br /> 7 DESWORK.GR1 <br /> 8 DESCRIPTION OF WORK <br /> 9111 10 FDESWORKI.DOCX <br /> 11 (March 13, 1995) <br /> 12 <br /> 13 This Contract provides for the improvement of ***The construction of 16,873 tons of Hot Mix <br /> 14 Asphalt, Class 1/2 inch, PG 64-22, two inch (2") thick, on selected City Streets, including <br /> 15 grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, monument case <br /> 16 and cover, striping, channelization, traffic induction loops*** and other work, all in <br /> 17 accordance with the attached Contract Plans, these Contract Provisions, and the Standard <br /> 18 Specifications. <br /> 19 <br /> 20 1-01.DOCX <br /> 21 Definition and Terms <br /> 22 <br /> 23 1-01.3.RTF <br /> 24 1-01.3 Definitions <br /> 25 (January 4, 2016 APWA GSP) <br /> 26 <br /> 27 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 28 them with the following: <br /> 29 <br /> 30 Dates <br /> 31 Bid Opening Date <br /> 32 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 33 Award Date <br /> 34 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 35 responsible and responsive Bidder for the Work. <br /> 36 Contract Execution Date <br /> 37 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 38 Notice to Proceed Date <br /> 39 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 40 Substantial Completion Date <br /> 41 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 42 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 43 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 44 replacement of temporary substitute facilities, plant establishment periods, or <br /> 45 correction or repair remains for the Physical Completion of the total Contract. <br /> 46 Physical Completion Date <br /> 47 The day all of the Work is physically completed on the project. All documentation <br /> 48 required by the Contract and required by law does not necessarily need to be <br /> 49 furnished by the Contractor by this date. <br /> 50 Completion Date <br /> 51 The day all the Work specified in the Contract is completed and all the obligations of 11152 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 2 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />