Laserfiche WebLink
1 Notice to Proceed <br /> 2 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 3 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 4 the Contract time begins. <br /> 5 <br /> 6 Traffic i <br /> 7 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 8 equestrian traffic. <br /> 9 <br /> 10 1-02.1.RTF <br /> 11 1-02 BID PROCEDURES AND CONDITIONS <br /> 12 <br /> 13 1-02.1 Prequalification of Bidders <br /> 14 <br /> 15 Delete this section and replace it with the following: <br /> 16 <br /> 17 1-02.1 Qualifications of Bidder <br /> 18 (January 24, 2011 APWA GSP) <br /> 19 <br /> 20 Before award of a public works contract, a bidder must meet at least the minimum <br /> 21 qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified <br /> 22 to be awarded a public works project. <br /> 23 <br /> 24 FCOE 1-02.2.DOCX <br /> 25 1-02.2 Pians and Specifications <br /> 111 <br /> 26 (June 27, 2011 APWA GSP) <br /> 27 <br /> 28 Delete this section and replace it with the following: <br /> 29 <br /> 30 Information as to where Bid Documents can be obtained or reviewed can be found in <br /> 31 the Call for Bids (Advertisement for Bids) for the work. <br /> 32 <br /> 33 After award of the contract, plans and specifications will be issued to the Contractor at <br /> 34 no cost as detailed below: <br /> 35 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 8 Furnished automatically <br /> 111 <br /> upon award. <br /> Contract Provisions Furnished automatically <br /> 4 upon award. <br /> Large plans (e.g., 22" x 2 Furnished only upon <br /> 34") request. <br /> 36 <br /> 37 Additional plans and Contract Provisions may be obtained by the Contractor from the111 <br /> 38 source stated in the Call for Bids, at the Contractor's own expense. <br /> 39 <br /> i <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 4 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />