Laserfiche WebLink
1 The following new paragraph is inserted before the last paragraph: <br /> 2 <br /> 3 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law <br /> 4 Compliance form (WSDOT Form 272-009). Failure to return this certification as part of <br /> 5 the Bid Proposal package will make this Bid Nonresponsive and ineligible for Award. A <br /> 6 Contractor Certification of Wage Law Compliance form is included in the Proposal <br /> 7 Forms. <br /> 8 <br /> 9 1-04.AP1 <br /> 10 Section 1-04, Scope of the Work <br /> 11 June 1, 2017 <br /> 12 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, I <br /> 13 Specifications, and Addenda <br /> 14 The following new paragraph is inserted before the second to last paragraph: <br /> 15 <br /> 16 Whenever reference is made in these Specifications or the Special Provisions to codes, <br /> 17 rules, specifications, and standards, the reference shall be construed to mean the code, <br /> 18 rule, specification, or standard that is in effect on the Bid advertisement date, unless111 <br /> 19 otherwise stated or as required by law. <br /> 20 <br /> 21 1-04.3 Reference Information <br /> 22 This section is supplemented with the following new sentence: <br /> 23 <br /> 24 If a document that is provided as reference information contains material also included <br /> 25 as a part of the Contract, that portion of the document shall be considered a part of the <br /> 26 Contract and not as Reference Information. <br /> 27 <br /> 28 1-04.4(2)A General <br /> 29 Item number 4 in the third paragraph is revised to read: <br /> 30 <br /> 111 <br /> 31 4. Provide substitution for deleted or reduced Condition of Award Work, Apprentice <br /> 32 Utilization and Training. <br /> 33 I 34 1-06.AP1 <br /> 35 Section 1-06, Control of Material <br /> 36 January 2, 2018 I <br /> 37 1-06.1(3) Aggregate Source Approval (ASA) Database <br /> 38 This section is supplemented with the following: <br /> 39 <br /> 40 Regardless of status of the source, whether listed or not listed in the ASA database the <br /> 41 source owner may be asked to provide testing results for toxicity in accordance with <br /> 42 Section 9-03.21(1). 1 <br /> 43 <br /> 44 1-06.2(2)D Quality Level Analysis <br /> 45 This section is supplemented with the following new subsection: I <br /> 46 <br /> 47 1-06.2(2)D5 Quality Level Calculation — HMA Compaction <br /> 48 The procedures for determining the quality level and pay factor for HMA compaction are <br /> 49 as follows: <br /> 50 <br /> 51 1. Determine the arithmetic mean, Xm, for compaction of the lot: <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 2 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />