My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> I 21x <br /> X in = <br /> n <br /> 3 <br /> III 4 Where: <br /> 5 x = individual compaction test values for each sublot in the lot. <br /> 6 Zx = summation of individual compaction test values <br /> 7 n = total number test values <br /> I 8 <br /> 9 2. Compute the sample standard deviation, "S", for each constituent: <br /> 10 <br /> z z <br /> 11 S = <br /> n1 x —(1X) <br /> I _ n(n—1) <br /> 12 <br /> 13 Where: <br /> I 14 >x2= summation of the squares of individual compaction test values <br /> 15 (Zx)2 = summation of the individual compaction test values squared <br /> 16 <br /> I 17 3. Compute the lower quality index (QL): <br /> 18 <br /> Xn, —LSL <br /> 19 Q, = <br /> S <br /> I <br /> 20 <br /> 21 Where: <br /> I 22 LSL = 91.5 <br /> 23 <br /> 24 4. Determine PL (the percent within the lower Specification limit which <br /> I 25 corresponds to a given QL) from Table 1. For negative values of QL, PL is equal <br /> 26 to 100 minus the table PL. If the value of QL does not correspond exactly to a <br /> 27 figure in the table, use the next higher value. <br /> I 28 <br /> 29 5. Determine the quality level (the total percent within Specification limits): <br /> 30 <br /> 31 Quality Level = PL <br /> 1 32 <br /> 33 6. Using the quality level from step 5, determine the composite pay factor (CPF) <br /> 34 from Table 2. <br /> I 35 <br /> 36 7. If the CPF determined from step 6 is 1.00 or greater: use that CPF for the <br /> 37 compaction lot; however, the maximum HMA compaction CPF using an LSL = <br /> I 38 91.5 shall be 1.05. <br /> 39 <br /> 40 8. If the CPF from step 6 is not 1.00 or greater: repeat steps 3 through 6 using an <br /> 41 LSL = 91.0. The value thus determined shall be the HMA compaction CPF for <br /> 42 that lot; however, the maximum HMA compaction CPF using an LSL = 91.00 <br /> 43 shall be 1.00. <br /> 44 <br /> I45 1-06.2(2)D4 Quality Level Calculation <br /> 46 The first paragraph (excluding the numbered list) is revised to read: <br /> 47 <br /> Ill <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 3 OF 53 March 6,2018 <br /> I WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.