My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 Contractor shall provide the Engineer with a revised schedule indicating when the <br /> 2 Contractor expects to reach substantial and physical completion of the work. <br /> I 3 <br /> 4 The above process shall be repeated until the Engineer establishes the Substantial <br /> 5 Completion Date and the Contractor considers the work physically complete and ready <br /> I 6 for final inspection. <br /> 7 <br /> 8 1-05.11(2) Final Inspection and Physical Completion Date <br /> I9 <br /> 10 When the Contractor considers the work physically complete and ready for final <br /> 11 inspection, the Contractor by written notice, shall request the Engineer to schedule a <br /> 12 final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> 13 Contractor will then make a final inspection and the Engineer will notify the Contractor in <br /> 14 writing of all particulars in which the final inspection reveals the work incomplete or <br /> 15 unacceptable. The Contractor shall immediately take such corrective measures as are <br /> I 16 necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br /> 17 diligently, and without interruption until physical completion of the listed deficiencies. This <br /> 18 process will continue until the Engineer is satisfied the listed deficiencies have been <br /> I 19 corrected. <br /> 20 <br /> 21 If action to correct the listed deficiencies is not initiated within 7 days after receipt of the <br /> I <br /> 22 <br /> 23 written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br /> 24 Section 1-05.7. <br /> I 25 The Contractor will not be allowed an extension of contract time because of a delay in <br /> 26 the performance of the work attributable to the exercise of the Engineer's right <br /> 27 hereunder. <br /> I 28 <br /> 29 Upon correction of all deficiencies, the Engineer will notify the Contractor and the <br /> 30 Contracting Agency, in writing, of the date upon which the work was considered <br /> 31 physically complete. That date shall constitute the Physical Completion Date of the <br /> 32 contract, but shall not imply acceptance of the work or that all the obligations of the <br /> 33 Contractor under the contract have been fulfilled. <br /> 34 <br /> I 35 1-05.11(3) Operational Testing <br /> 36 <br /> 37 It is the intent of the Contracting Agency to have at the Physical Completion Date a <br /> I 38 complete and operable system. Therefore when the work involves the installation of <br /> 39 machinery or other mechanical equipment; street lighting, electrical distribution or signal <br /> 40 systems; irrigation systems; buildings; or other similar work it may be desirable for the <br /> I <br /> 41 <br /> 42 Engineer to have the Contractor operate and test the work for a period of time after final <br /> inspection but prior to the physical completion date. Whenever items of work are listed in <br /> 43 the Contract Provisions for operational testing they shall be fully tested under operating <br /> I 44 conditions for the time period specified to ensure their acceptability prior to the Physical <br /> 45 Completion Date. During and following the test period, the Contractor shall correct any <br /> 46 items of workmanship, materials, or equipment which prove faulty, or that are not in first <br /> 47 class operating condition. Equipment, electrical controls, meters, or other devices and <br /> I <br /> 48 equipment to be tested during this period shall be tested under the observation of the <br /> 49 Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> 50 they were installed. The Physical Completion Date cannot be established until testing <br /> I <br /> 51 and corrections have been completed to the satisfaction of the Engineer. <br /> 52 <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 13 OF 57 March 6,2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.