Laserfiche WebLink
wgas, labor, material, supplies, and everything else needed to <br /> 1 The costs for power, pp ry g <br /> 2 successfully complete operational testing, shall be included in the unit contract prices <br /> 3 related to the system being tested, unless specifically set forth otherwise in the proposal. I <br /> 4 <br /> 5 Operational and test periods, when required by the Engineer, shall not affect a <br /> 6 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> 7 <br /> 8 <br /> 9 1-05.13.RTF <br /> 10 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> 11 (August 14, 2013 APWA GSP) <br /> 12 <br /> 13 Delete the sixth and seventh paragraphs of this section. <br /> 14 <br /> 15 1-05.15.RTF <br /> 16 1-05.15 Method of Serving Notices <br /> 17 (March 25, 2009 APWA GSP) <br /> 18 Revise the second paragraph to read: I <br /> 19 <br /> 20 All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> 21 correspondence from the Contractor constituting any notification, notice of protest, notice <br /> 22 of dispute, or other correspondence constituting notification required to be furnished <br /> 23 under the Contract, must be in paper format, hand delivered or sent via mail delivery <br /> 24 service to the Project Engineer's office. Electronic copies such as e-mails <br /> or <br /> 25 electronically delivered copies of correspondence will not constitute such notice and will <br /> 26 not comply with the requirements of the Contract. <br /> 27 <br /> 28 1-05.16.RTF <br /> 29 Add the following new section: <br /> 30 <br /> 31 1-05.16 Water and Power <br /> 32 (October 1, 2005 APWA GSP) <br /> 33 <br /> 34 The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> 35 and water necessary for the performance of the work, unless the contract includes power <br /> 36 and water as a pay item. <br /> 37 <br /> 38 1-07.GR1 <br /> 39 Legal Relations and Responsibilities to the Public <br /> 40 <br /> 41 1-07.1.RTF <br /> 42 1-07.1 Laws to be Observed <br /> 43 (October 1, 2005 APWA GSP) <br /> 44 <br /> 45 Supplement this section with the following: <br /> 46 <br /> 47 In cases of conflict between different safety regulations, the more stringent regulation <br /> 48 shall apply. <br /> 49 <br /> 50 The Washington State Department of Labor and Industries shall be the sole and <br /> 51 paramount administrative agency responsible for the administration of the provisions of <br /> 52 the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> 53 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 14 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />