Laserfiche WebLink
1 1 <br /> 2 33rd St Lane closures for casting adjustments will not be permitted <br /> 3 9:00pm to 7:00am. All lane closures shall occur on Saturday to <br /> 4 avoid conflicts with transit access. <br /> 5 <br /> 6 Federal Ave No Restrictions, except that lane closures for casting <br /> I <br /> 7 adjustments will not be permitted 9:00pm to 7:00am and lane <br /> 8 closures for plastic pavement marking work shall not occur <br /> 9 between the hours of 5:00am to 7:00pm. I 10 <br /> 11 Colby Ave No Restrictions, except that lane closures for casting <br /> 12 adjustments will not be permitted 9:00pm to 7:00am and lane <br /> I <br /> 13 closures for plastic pavement marking and traffic loop work <br /> 14 shall not occur between the hours of 5:00am to 7:00pm. Lane <br /> 15 closures on Colby Ave and 19th St shall not occur <br /> I <br /> 16 simultaneously due to conflicts that would occur as a result of <br /> 17 transit rerouting. <br /> 18 <br /> 19 19th St -Grand Ave No Restrictions, except that lane closures for castingI <br /> 20 to Colby Ave adjustments will not be permitted 9:00pm to 7:00am and lane <br /> 21 closures for plastic pavement marking and traffic loops work <br /> 22 shall not occur between the hours of 5:00am to 7:00pm. Lane <br /> I <br /> 23 closures on Colby Ave and 19th St shall not occur <br /> 24 simultaneously due to conflicts that would occur as a result of <br /> 25 transit rerouting. I 26 <br /> 27 Lombard Ave No Restrictions, except that lane closures for casting <br /> 28 adjustments will not be permitted 9:00pm to 7:00am. I 29 <br /> 30 <br /> 31 Larimer Rd No roadway closures, detours, or lane closures will be <br /> I <br /> 32 permitted between 5:00am and 7:00pm, except for casting <br /> 33 adjustments. Lane closures for plastic pavement marking work <br /> 34 shall not occur between the hours of 5:00am to 6:00pm. <br /> 35 Roadway closure with detour shown in the Plans will be <br /> I <br /> 36 allowed between 7:00pm and 5:00am. Three days prior <br /> 37 notification in advance of the street closure and closure signing <br /> 38 is required. I 39 <br /> 40 49th St SW No Restrictions, except that lane closures for casting <br /> 41 adjustments will not be permitted 9:00pm to 7:00am. ' <br /> 42 <br /> 43 Beverly Blvd No lane closures will be permitted between 5:00am and <br /> 44 6:00pm, except for casting adjustments. Lane closures for I 45 plastic pavement marking work shall not occur between the <br /> 46 hours of 5:00am to 7:00pm. Lane closures for casting <br /> 47 adjustments will not be permitted 2:00pm to 6:00pm and <br /> I <br /> 48 9:00pm to 7:00am. <br /> 49 <br /> 50 38th St No Restrictions, except that lane closures for casting <br /> 51 adjustments will not be permitted 9:00pm to 7:00am. I <br /> 52 <br /> 53 Walnut St No Restrictions, except that lane closures for casting <br /> 54 adjustments will not be permitted 9:00pm to 7:00am and lane <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 24 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> I <br /> SPECIAL PROVISIONS <br />