Laserfiche WebLink
1 Hoyt Ave No Restrictions, except that lane closures for casting <br /> 2 adjustments will not be permitted 9:00pm to 7:00am. <br /> 3 <br /> 4 37th St No Restrictions, except that lane closures for casting <br /> 5 adjustments will not be permitted 9:00pm to 7:00am. <br /> 6 <br /> 7 38th St No Restrictions, except that lane closures for casting <br /> 8 adjustments will not be permitted 9:00pm to 7:00am. <br /> 9 <br /> 10 Lombard Ave No Restrictions, except that lane closures for casting <br /> 11 adjustments will not be permitted 9:00pm to 7:00am. <br /> 12 <br /> 13 Alleys No Restrictions, except that lane closures for casting <br /> 14 adjustments will not be permitted 9:00pm to 7:00am. <br /> 15 <br /> 16 *** <br /> 17 <br /> 18 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 19 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor I <br /> 20 in writing of any change in the closure hours. <br /> 21 <br /> 22 Lane closures are not allowed on any of the following: <br /> 23 <br /> 24 1. A holiday, <br /> 25 <br /> 26 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or <br /> 27 Monday are considered a holiday weekend. A holiday weekend includes <br /> 28 Saturday, Sunday, and the holiday. <br /> 29 <br /> 30 3. After*** 2:30 P.M. *** on the day prior to a holiday or holiday weekend, and <br /> 31 <br /> 32 4. Before *** 7:00 A.M. *** on the day after the holiday or holiday weekend. <br /> 33 <br /> 34 1-07.24.RTF <br /> 35 1-07.24 Rights of Way <br /> 36 (July 23, 2015 APWA GSP) <br /> 37 <br /> 38 Delete this section and replace it with the following: <br /> 39 <br /> 40 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> 41 indicated in the Plans. The Contractor's construction activities shall be confined within ' <br /> 42 these limits, unless arrangements for use of private property are made. <br /> 43 <br /> 44 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 45 way and easements, both permanent and temporary, necessary for carrying out the <br /> 46 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 47 Contractor's attention by a duly issued Addendum. <br /> 48 <br /> 49 Whenever any of the work is accomplished on or through property other than public <br /> 50 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 51 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 52 property. Copies of the easement agreements may be included in the Contract <br /> 53 Provisions or made available to the Contractor as soon as practical after they have been <br /> 54 obtained by the Engineer. , <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 26 OF 57 March 6, 2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />