Laserfiche WebLink
I <br /> 1 <br /> 2 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> I 3 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> 4 of the work in areas where right of way, easements or rights of entry have not been <br /> 5 acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> I 6 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 7 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> 8 entry or right of way, the Contractor will be entitled to an extension of time. The <br /> I <br /> 9 Contractor agrees that such delay shall not be a breach of contract. <br /> 10 <br /> 11 Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br /> I <br /> 12 <br /> 13 includes entry onto easements and private property where private improvements must <br /> be adjusted. <br /> 14 <br /> I 15 The Contractor shall be responsible for providing, without expense or liability to the <br /> 16 Contracting Agency, any additional land and access thereto that the Contractor may <br /> 17 desire for temporary construction facilities, storage of materials, or other Contractor <br /> 18 needs. However, before using any private property, whether adjoining the work or not, <br /> 19 the Contractor shall file with the Engineer a written permission of the private property <br /> 20 owner, and, upon vacating the premises, a written release from the property owner of <br /> 21 each property disturbed or otherwise interfered with by reasons of construction pursued <br /> I <br /> 22 under this contract. The statement shall be signed by the private property owner, or <br /> 23 proper authority acting for the owner of the private property affected, stating that <br /> 24 permission has been granted to use the property and all necessary permits have been <br /> I 25 obtained or, in the case of a release, that the restoration of the property has been <br /> 26 satisfactorily accomplished. The statement shall include the parcel number, address, <br /> 27 and date of signature. Written releases must be filed with the Engineer before the <br /> I 28 Completion Date will be established. <br /> 29 <br /> 30 1-08.0.RTF <br /> 1 31 1-08 PROSECUTION AND PROGRESS <br /> JG <br /> I 33 Add the following new section: <br /> 34 <br /> 35 1-08.0 Preliminary Matters <br /> I 36 (May 25, 2006 APWA GSP) <br /> 37 <br /> 38 GLF 1-08.0(1).DOCX <br /> I 39 Add the following new section: <br /> 40 <br /> 41 1-08.0(1) Preconstruction Conference <br /> I 42 (October 10, 2008 APWA GSP) <br /> 43 <br /> 44 Prior to the Contractor beginning the work, a preconstruction conference will be held <br /> I 45 between the Contractor, the Engineer and such other interested parties as may be <br /> 46 invited. The purpose of the preconstruction conference will be: <br /> 47 1. To review the initial progress schedule; <br /> I 48 2. To establish a working understanding among the various parties associated or <br /> 49 affected by the work; <br /> 50 3. To establish and review procedures for progress payment, notifications, approvals, <br /> 1 51 submittals, etc.; <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 27 OF 57 March 6,2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />